In Situ Measurement of Preferential Flow
An experiment was performed that quantifies the variability of flow paths in the vadoze zone. Bromide tracer and an organic dye, which has many of the same transport characteristics as...
Groundwater Protection in New York State
Groundwater protection is implemented by a variety of governmental entities. At the state level, the Departments of Environmental Conservation (DEC), and of Health (DOH) are the agencies...
Principles of Ground Water Strategy
The states are now preparing or adopting ground water strategies under EPA direction. State and federal initiatives are currently uncoordinated, and do not add up to a coherent program....
Who is the Public?
The old concept of applying to the state for a right to use water has changed as the availability of unappropriated water has disappeared. Today the emphasis is on acquiring a water right...
Application of DDDP for Optimal Daily Operation of the Niagara Generating System
This paper describes the application of Discrete Differential Dynamic Programming (DDDP) to determine the optimal operation of Ontario Hydro's Niagara Generating System, on...
100 Years of Sedimentation Study by the USGS
On January 15, 1889, the U.S. Geological Survey began collecting sediment data on the Rio Grande at Embudo, New Mexico. During the past 100 years the U.S. Geological Survey's...
Hydraulic Design of the Unser Boulevard Crossing
As an integral part of the design process, a comprehensive hydrologic, hydraulic and sediment transport analysis was completed of the proposed Unser Boulevard crossing of Calabacillas...
Hydraulic Analysis of the Schoharie Creek Bridge
Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was...
Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...
Physical Model Study of New York State Dam
The New York State Dam is located on the Mohawk River near its confluence with the Hudson River. Downstream from the dam, the river flow is divided into six channels as the water passes...
Moose River Air Chamber Design and Performance
The Moose River Hydroelectric Project is a 12.5 MW development located in upstate New York. It employs an underground air chamber to protect the unit and power tunnel from pressure surges...
Licensing the Moose River Hydroelectric Project
This paper describes environmental considerations in the licensing and permitting of the Moose River Hydroelectric Project, a 12.2 MW development in Central New York State. It illustrates...
Geology and Hydrofacture, Moose River Power Tunnel, New York
The Moose River Hydroelectric Project, Lyonsdale, New York, is constructed in Precambrian gneiss of the western Adirondack Mountains. A key element of the project was construction and...
In-Situ Shear Strength Testing
Dam stabilization requirements at the Upper Mechanicville Hydroelectric Project on the Hudson River in New York were significantly modified based on the results of an in-situ direct shear...
The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
The project, consisting of eight 8.2m bulb turbines rated at 192MW, is located in the State of Louisiana and will use a portion of the water diverted from the Mississippi River to the...
Electrical and Mechanical Design, Commissioning, and Performance of the Moose River Hydroelectric Project
The Moose River Hydroelectric Project is a single-unit run-of-river hydroelectric facility located near Lyonsdale, New York, and was developed by a private firm. The generating equipment...
Crest Gates Design for Upper Mechanicville
This paper describes the design of flap-type spillway crest gates for the Upper Mechanicville Project, located on the Hudson River near Mechanicville, New York. These gates are being provided...
Vibration Problems of Penstock Piping for a Vertical Tubular Hydraulic Turbine
Excessive vibration amplitudes were experienced in the vertical gated tubular units at the Great Falls Hydroelectric Project located in the City of Paterson, New Jersey. Vibration amplitude...
Turbine Runner Procurement for the Robert Moses Niagara Power Plant Upgrade
Procurement of the new runners involved the selection of two manufacturers who have entered into a design competition in which competing models will be tested in an independent hydraulic...
Field Efficiency Tests of a Large Pump-Turbine
The New York Power Authority's Blenheim-Gilboa Pumped Storage Project began commercial operation in 1973. In 1987, the Authority initiated a study of the existing pump/turbines...
Return to search