Effect of Nile River Flow on Performance of Shoubrah Power Plant Cooling System
Shoubrah El-Khimah Power Plant was built in 1982. Its peak capacity is 1200 MW, generated by four units, three of them having one cooling water intake. The cooling water pumps suffer from...

Bed Forms of Nile River
In this paper, the observed bed forms for six different reaches of the Nile River in Egypt are described. The purpose of the study is to inquire whether or not the different available...

Sediment Transport Measurements in the Nile River at Bani Mazar
Measurements of sediment transport on the Nile River were conducted at Bani Mazar (200 km South of Cairo) during high and low water stages. Bed-load and suspended-load transport rates...

Movable-Bed Model to Evaluate Nile River Dredging
About 200 km south of Cario, at Bani Mazar reach, the Nile River has widened and formed several islands. The result is three channels with shallow depths. One of the branches must be improved...

Application of Stable Channel Design Method
Systematic stable channel design methods are currently being developed by the US Army Engineer Waterways Experiment Station for use in the planning stages of local flood control projects....

Hydraulic Aspects of Grade Control Structures
This paper describes the function of grade control structures. The primary purpose of a grade control structure is to maintain or establish a desired bed elevation in a channel. Basically...

Bed Load Roughness in Supercritical Flow
A supercritical concrete channel is proposed for Mission Creek located in Santa Barbara County, California. The proposed channel may transport gravels and cobbles as bed load during large...

Relationship Between Scour Depth and Bend Radius of Curvature on the Red River
Studies of bank and bend processes were undertaken on the Red River between Index, Arkansas and Shreveport, Louisiana in connection with the navigation project on the river downstream...

Riprap Design Criteria for the ARS Low Drop Structure
The ARS low drop grade control structure has proven to be an effective means to stabilize incised channels in Mississippi. However, field inspections and laboratory testing have indicated...

Operational Procedures for Estimating Bottom Exchange Rates
After briefly reviewing the terminology of the various bottom and water column exchange fluxes, the body of this paper summarizes five possible procedures for establishing operational...

Pump Station/Storage Opportunities for Urban Freeway Systems
This paper introduces the concept of utilizing underground storage to minimize both the initial cost and the long-term maintenance and operation costs of multiple pump stations for a freeway...

Optimizing Regional Detention Basins for Price Expressway
Stormwater runoff from the drainage area contributing to the Price-Santan Freeway is captured in regional detention basins which require a series of pump stations for evacuation. With...

Three-Dimensional Velocity Distribution at Open-Channel Diversions
A study is underway to develop an improved understanding of the 3-D flow pattern at 90? diversions. The main goal is to explain, via the velocity distribution, the behavior of sediment...

Design of Groins on the Middle Rio Grande
The Albuquerque Projects Office of the Bureau of Reclamation wanted to use groins in place of revetments at two sites on the Rio Grande. The Bureau of Reclamation has limited experience...

Submerged Vane Projects for Bank Stabilization and Sedimentation Management
Submerged vanes are small flow training devices placed in a stream to eliminate or create secondary currents to direct sediment in a controlled fashion. In recent years submerged vanes...

Hatchie River and Schoharie Creek Bridge Failures
Within a 2-year period two large bridges collapsed into flooded rivers resulting in a total of 18 people plunging to their deaths. Both bridges had been inspected by probing, but had not...

Bridge Inspections Related to Bridge Scour
The failure of the Silver Bridge over the Ohio River in Point Pleasant, West Virginia, on December 15, 1967 resulted in the establishment of the National Bridge Inspection Standards (NBIS)...

Environmental Considerations in Sustainable Development and the Application of Appropriate Technology
A fundamental appropriate technology concept is that technologies, as well as the development process, must be environmentally sound. As stated by the United Nations' World...

Local Resources in Developing Country Water Supplies
Maximizing the use of local resources in water supply projects can expand markets for locally produced equipment and materials, reduce exports and minimize expenditures of hard currency...

Hydrodynamic Modeling of Bolsa Chica, California, Proposed Wetland Enhancements
The California State Lands Commission (SLC) requested US Army Engineer Waterways Experiment Station (WES), Coastal Engineering Research Center (CERC), to conduct engineering studies for...

 

 

 

 

Return to search