Borden Field Data and Multivariate Geostatistics
A large-scale field experiment on natural gradient transport of solutes in groundwater was conducted in an unconfined sand aquifer in Borden, Ontario by extensive monitoring after the...

Hydraulic Analysis of the Schoharie Creek Bridge
Ten people died on April 5, 1987 as a result of the collapse of two spans of a New York State Thruway bridge into the floodwaters of Schoharie Creek. The cause of the bridge failure was...

1-D and 2-D Analysis of Flood Plain Encroachment
The paper reports on a study into the effects of a local encroachment in a broad regular flood plain. The results of a one-dimensional analysis were compared with the results of an equivalent...

Southwest Pass Training Structure Alternatives
The U.S. Army Engineer Waterways Experiment Station system of computer programs, TABS-2, was utilized to evaluate various structural plans for increasing channel velocities and sediment...

Grid Requirements for Numerical Models Containing Training Works
The numerical modeling of the rapid changes in flow variable in open channel flow systems containing training works, such as dikes, requires special attention in grid development. This...

High-Resolution Two Dimensional Advective Transport
The paper describes a two-dimensional high-resolution scheme for advective transport that is based on a Eulerian-Lagrangian method with a flux limiter. The scheme is applied to the problem...

Numerical Prediction of the Turbulent Flow with a Free Surface for 3-Dimensional Situation
An efficient finite-difference method, the HH-SIMPLE, has been developed that is based on a new concept of hydraulic pressure with two additional equations concerning the water surface...

Infiltration Trenches for Urban Runoff Control
A two-dimensional finite element model has been developed to simulate the transient flow in a variably saturated porous medium for the study of infiltration trenches. Parameters such as...

Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...

Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...

Important Aspects of Annual Energy Calculation Techniques for Low Head Hydro Power Plants
Annual energy calculations are frequently used to optimize design parameters at a turbine site and to compare energy production based on equipment offers from various suppliers. In this...

Challenging Site Conditions Lead to Unusual and Innovative Powerhouse Design Features
Pacific Gas & Electric Company's recently completed Newcastle Powerhouse is located on the shore of Folsom Lake near Auburn, California. The $26 million facility uses...

Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...

Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...

Cofferdams: An Integral Part of Small Hydro Design
Cofferdam construction costs can be a major factor in the viability of a small hydro development. For this reason, cost-effective design and construction are critical. A cost-effective...

Flashboard Alternatives Including Rubber Dams
This paper reviews some common flashboard methods used in the northeastern part of the U.S., and discusses the advantages and disadvantages of each type. The inflatable rubber dam is presented...

Hydraulic Features of Canyon Lake Hydropower Plant
The original hydraulic features of the Canyon Lake dam were well adapted to the addition of hydropower. Design, construction and anticipated operational details of the added hydropower...

Effects of the Environmental Approval Process on Project Scheduling and Economics
The environmental approval process is fundamental to the permitting of hydropower projects. Recent changes in permitting requirements has had a significant effect on the cost and schedule...

FERC's Experience in Analyzing Cumulative Impacts
Since the mid-1980's, the Federal Energy Regulatory Commission (Commission) has assessed cumulative impacts associated with developing proposed hydropower projects. A brief...

Newfoundland's First Arch Dam Construction Versus Climate
Paradise River arch dam is located in a narrow box canyon about 50 m deep and less than 10 m wide at streambed. It is a thin arch dam, especially sensitive to temperature loads, thus contraction...

 

 

 

 

Return to search