Construction of Elk Creek Dam
Construction of Elk Creek Dam, located in Southwest Oregon, is currently underway with completion scheduled for September 1988. The main dam contract was awarded to Ohbayashi Gumi Ltd....

Construction of Upper Stillwater Dam
This paper describes the equipment, placing methods, and peak production rates from the contractor's viewpoint for both the Roller Compacted Concrete and the Slipformed Facing...

Quality Control/Inspection�Upper Stillwater Dam
Roller compacted concrete construction, or RCC, is a relatively new method of constructing concrete dams and involves placing and spreading no-slump concrete in horizontal layers and compacting...

Whither Roller Compacted Concrete for Dam Construction?
During the formative years of the roller compacted concrete (RCC) dam, three different approaches to the design have evolved; the lean RCC dam, the RCD (rolled-concrete dam) method and...

Quality of Works in RCC in France: A Contractor's Solution
Bec Freres S. A. , a French dam contractor, introduced the technique of roller compacted concrete (RCC) into France. The first two French RCC dams were built as a result of a program of...

RCC in Dams in Australia
The design, construction and performance of the first three dams constructed in Australia, using RCC are described. Aspects covered in the paper include designing for zero cohesion between...

Saco Dam?South America's First RCC Dam
Because of cost and a lack of suitable embankment materials, Saco Dam at Nova Olinda in Paraiba, Brazil, was redesigned and built with lean roller compacted concrete (RCC). The structure...

Roller Compacted Concrete Design for Urugua-I Dam
Gravity dam construction by the roller compacted concrete method (RCC) has received widespread interest following completion of Shimajigawa Dam in Japan (1981) and Willow Creek Dam in...

RCC Pavements in Tasmania, Australia
Over 60,000 m**2 of high strength Roller Compacted Concrete (RCC) pavement has been completed in Tasmania, Australia, since December 1986. Projects have ranged from footpaths and small...

Proportioning RCC Pavement Mixtures
The U. S. Army Corps of Engineers has begun using roller compacted concrete for construction of heavy-duty pavements and low volume streets and roads which are exposed to low-speed tracked...

RCC Storage Pads at Tooele Army Depot, Utah
Two 30. 5 m (100 foot) by 91. 4 m (300 foot) ammunition storage pads, each 381 mm (15 inches) thick, were constructed by the Sacramento District of the U. S. Army Corps of Engineers in...

Rennick Yard RCC Pavement Design and Construction
Rennick Yard roller compacted concrete paving project consisting of 136,000 multiplied by (times) yd**2 (113,710 m**2) was completed in June 1986. The design load for this project was...

Roller Compacted Concrete with Marginal Aggregates
Roller compacted concrete is a technology which is vastly expanding beyond the traditional uses of pavement and dam oriented projects. Hornsby Bend Wastewater Treatment Plant required...

Corps of Engineers Experience with RCC Pavements
Roller compacted concrete pavements were first developed in the U. S. by the Corps of Engineers in 1975. Since that time, RCC pavements have been constructed throughout much of the U....

RCC Pavement Construction and Quality Control
In October 1986 a 16,500 sq yd (14,300 sq m) roller-compacted concrete (RCC) pavement tank hardstand, the first of its kind in Europe, was built for the U. S. Army at Harvey Barracks in...

Design of Roller Compacted Concrete Pavements
This paper reviews some of the differences between roller compacted concrete and conventionally constructed concrete pavements. These differences require additional consideration during...

Geotechnical Exploration and Site Preparation Techniques for Large Mall in Karst Terrain
A large commercial mall and secondary developments were planned for construction in a karst area near Clarksville, Tennessee. A geotechnical exploration was conducted to evaluate the occurence...

Treatment of Karst Along Tennessee Highways
The construction and maintenance of highways in karst areas of East Tennessee has resulted in the occurrence and treatment of induced sinkholes along the ditchlines of numerous highways....

Foundation Treatment of Karstic Features Under TVA Dams
TVA has constructed many of its dams on limestone foundations. Some of these foundations have been highly weathered and required special treatment not only to ensure strength but to develop...

Geosynthetics in the NATM Tunnel Design
This paper describes the Design Methodology for the New Austrian Tunneling Method (NATM) with special emphasis on the geotextile and geomembrane commonly used in the waterproofing design...

 

 

 

 

Return to search