Automated Position and Control Systems Using Lasers and Electromagnetic Signals
Positioning is a crucial area in the successful integration of CAD data into the construction process. This paper looks at several areas of positioning using lasers and electromagnetic...

Subcontractors' Concerns Regarding Productivity
This study suggests that smaller contractors, many of whom operate as sub-contractors, are less interested than larger firms in taking an active part in identifying, funding, and conducting...

Discussion of the Use of Multi-Design Contracts
The paper begins by defining the multi-prime contract for design services, under which there is more than one contract between design professional and owner for a single project. It then...

Contracting for Quality Facilities
Currently, Department of Defense (DoD) contracting for facilities is done almost exclusively with sealed-bid solicitations, low-bid awards, and firm-fixed-price (FFP) contracts. Quality...

Effect of Planning Errors on Construction Safety
A discussion of the planning phase of the building process associated with all the activities that are accomplished during this phase is presented. The different types of errors that occur...

The Resident Engineer?A Member of the Construction Team
The prime concern of a Resident Engineer is to see to it that the structure is built in accordance with the plans and specifications and that the work is carried out in a proper manner....

Human Factors of Project Organization
The nature of construction demands people who can move with the unique and dynamic conditions of the changing environment. Knowing the requirements of the project environment and culture...

Decision Support System for Achieving and Measuring Design Effectiveness
A microcomputer program is developed to serve as a decision system for improving design effectiveness. The program, called 'Design Effectiveness Evaluation and Implementation...

The Jet Set
The new maintenance hangar now nearing completion at Charlotte/Douglas International Airport has aluminum standing seam roofing. The unusual material was specified because every ounce...

Developing Performance Concrete and Its Acceptance by Code Authorities
Projects incorporating the benefits of Performance Oriented Concrete frequently occur within the established jurisdictions of specific building departments, highway departments, or other...

Building Onto History
In a single design/build/renovation project, an Oklahoma City AE firm acquired new offices, provided new life for an abandoned historic church building and spearheaded redevelopment of...

Bells Under Bells
Chicago's newest office tower is supported on new bells that had to be constructed below existing belled caissons. Existing caisson foundations from a previous structure on...

Roller Compacted Concrete II
This volume includes the papers presented at the 1988 ASCE Specialty Conference on Roller Compacted Concrete. Included in the proceedings are experiences of roller compacted concrete dam...

Microcad: Pushing the Limits
Several engineering projects are covered which illustrate the increasingly complex design applications being accomplished with microcomputer based software. A dam, an apartment complex,...

Rehabilitation of Existing Hydro, Our Oldest Natural Resource
With renewed interest in hydro, many old sites are being rehabilitated to achieve maximum power output and higher efficiencies. Rehabilitated plants are now performing at optimal levels,...

The Uses of CADD in Hydropower Development
The hydropower community needs inexpensive methods to thoroughly and quickly analyze the siting of hydroelectric projects. Computer-aided design and drafting (CADD) and programs like HYSIZE...

Non-Federal Hydropower Development at Federal Facilities from the Project Developer's Perspective
The City of Santa Clara Electric Department has three small hydroelectric projects in various stages of development at federally-owned facilities. Although all three of the Federal Energy...

Development of Turbine Intake Downstream Migrant Diversion Screen
Prior to the spring of 1986 Public Utility District No. 2 of Grant County had developed a passive turbine intake screen design. A prototype of this design was placed in the emergency gate...

Protection of Juvenile Anadromous Fish
Protection of juvenile anadromous fish (salmon, steelhead, etc. ) during their seaward migration is a major concern in the Pacific Northwest. The existing screening structures at the head...

Hydrologic Studies for Dinkey Creek Hydro-Electric Project
The economic analysis and final design of the 120 MW hydro-electric development on Dinkey Creek, a tributary of the North Fork of the Kings River in the Central Valley of California, requires...

 

 

 

 

Return to search