Fall Protection & Debris Containment During Construction
The purpose of this paper is to review the current practices in the United States for both fall protection and debris protection during high rise construction. A performance comparison...

Temporary Lateral Support System for Historic Building Facades in Boston
This paper describes a system of vertically cantilevered structural steel trusses, designed by the author, that provided temporary lateral support for a group of five and six story, 120...

Performance of a Prestressed Rigid Frame During Removal of Column 6W from I93 in Boston, Massachusetts
The first phase of the suppression of Boston's Central Artery included the Early Viaduct Construction in the Central Artery North Area. This project required that Column 6W...

Temporary Traffic Deck Over Braced Excavation
A case history is used to examine the planning, design, and installation of a temporary traffic deck over a 23-foot-deep braced excavation. The deck was installed in a three-phase sequence...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Modular-Prestressed Shoring System for Demolition
Two case histories are used to present the development and performance of a modular prestressed vertical shoring system to control deflections of existing structures during the demolition...

Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...

Composite Twin Tub Bridge Erection Intersection of Interstate I-84 and I-94 in Hartford, Connecticut
Curved bridge erection requires detailed preparation by the contractor, plus a sharing of responsibility and liability between the owner, designer of the new structure and the contractor....

Computer Assisted Design and Construction
This paper presents a comprehensive package for conducting structural analysis, design, and project management on microcomputers. Several examples are presented to illustrate the usefulness...

The Virtual Design Team: An Object-Oriented Model of Information Sharing in Project Design Teams
The Virtual Design Team (VDT) is an object-oriented, discrete event simulation of a multidisciplinary design team in action. The VDT models a design task as a network of design and design...

Boston Central Artery/Tunnel Project?Fort Point Channel I-90 Tunnel Crossing
Part of the Central Artery and Third Harbor Tunnel Project involves the construction of a very unusual section of immersed tunnel. While the Third Harbor Tunnel which will cross Boston...

Ductile Frames Are Tough for Earthquakes
Implications of a new structural system in wharf design go far beyond San Francisco Bay, where two such wharves remained intact after the 1989 Loma Prieta quake. The design, introduced...

Methane Tracer Technique for Gas Transfer at Hydraulic Structures
Using a simple headspace gas chromatographic technique, gas transfer at several hydraulic structures were investigated. Naturally occurring methane was used as a tracer gas to measure...

Gas Transfer at Hydraulic Structures
The objective of this paper is to identify and briefly summarize the state-of-the-art in measuring and describing gas transfer at hydraulic structures. Basic theory of mass transfer at...

Oxygen Transfer at Spillways
A relationship for oxygen transfer efficiency, E, at spillways and gated spillways with a hydraulic jump or plunge pool, has been developed from conceptual considerations and fit to measurements...

Hydraulic Engineering
This proceedings, Hydraulic Engineering, contains papers presented at the National Conference on Hydraulic Engineering, held in Nashville,...

Rehab Roundup
The concrete exterior of San Franciso's Coit Tower was damaged and the murals were being destroyed by water infiltrating the structure. Interactive Resources, Inc., Point...

Jointless Redecking
If you're redecking a bridge, why not eliminate a major cause of its corrosion at the same time? Why not remove the expansion joints? The Department of Public Works in Steuben...

Quake-Safe Housing, Again
Because so little data exist about earthquake behavior of buildings that have been strengthened to meet seismic codes, many engineers are curious about the Hotel Oakland in California...

Corrosion Below: Sewer Structures
When a sewer system fails, the cause is often not the pipe but a manhole, junction or other special-purpose structure. Most of these structures are concrete, either cast in place or precast....

 

 

 

 