Ambient Suspended Sediment Concentration and Turbidity Levels
The temporal variation of suspended sediment concentration and turbidity is an important component of the riverine environment. The maximum rate of discrete volumetric sample collection...
Turbulence and Reynolds Stress Distribution in a Natural River
Turbulence characteristics of ambient flow velocities and their comparison with those generated by the movement of barge traffic within the channel border area in a navigation waterway...
A Knowledge-Based System for the Environmental Design of Waterways (ENDOW)
Knowledge-based software systems accept problem descriptions from users and apply logic in order to generate a solution or solution set. These systems function over very narrow problem...
LISP or CLIPS: Selecting an Expert System Tool in Hydraulic Engineering
The transfer of Artificial Intelligence(AI) technology from the research laboratories to the scientific and engineering environments has been made possible by phenomenal advances in computer...
Measurements to Calibrate Suspended Sediment Model for Adsorbed Contaminant Transport Study of North Fork Holston River, Virginia
A daily suspended sediment (SS) and mercury transport model was developed for a 25-mile reach of the North Fork Holston River below Saltville, Virginia. Daily streamflow measurements;...
An Engineering Analysis of Sedimentation in Tidal Inlets
The engineering comparative analysis of deposition and scour of noncohesive sediments in the neighborhood of bridges over tidal inlets is a unique problem which does not lend itself conveniently...
Fluid Mud Problems in Lakes, Reservoirs and Detention Ponds
An experimental study of wind induced surfacing of fluid mud bottoms in shallow water has been conducted. The experiments involved a channel placed within a wind tunnel, where a two-layered,...
Fluvial Recharge of Sand Mining Pit
Accuracy in modeling fluvial processes becomes increasingly important as development occurs along waterways. The FLUVIAL-12 (1, 2) model is used to simulate the recharge of sand mining...
Legal Principles and Theories
Legal issues are intertwined with all aspects of the technical considerations relating to temporary structures. This paper presents an introduction to the legal theories which relate to...
Who Pays for the Unexpected in Construction: The Geotechnical Contractor's Point of View
Unexpected conditions are inherent in most construction projects and often lead to claims and legal action. Contract risk avoidance language force owners, engineers and contractors to...
Who Pays for the Unexpected in Construction?An Architect's Viewpoint
As an Architect, who in the first instance is contractually obligated to address the full range of design discipline services, the question of 'who pays for the unexpected...
Construction Product Performance, The Unexpected
Efforts made in the construction, industry to increase the quality of the constructed facility through the development of new materials and systems and through the reduction of labor intensive...
Animation of Automated Space Construction
This paper presents a discussion of Three-Dimensional Computer Animation as applied to the evaluation of Lunar/Mars construction. A number of applications for this type of tool are introduced....
Construction and Robotics: Problems and Solutions
The role of robotics in construction, and the role played by construction engineers (CE's) is placed in perspective. Robot development, like machine manufacture, has always...
Project Management in Areas of Socio-Political Conflict
Project managers routinely deal with project locations which provide adverse environmental conditions. A location in which social and political conflict exists may prove to be extremely...
The Role of Scheduling in Computer Integrated Construction
Engineering and construction firms are showing a growing interest in computer integrated construction because they recognize the increased productivity and quality that can be obtained...
A Framework for Reasoning About CAD Data
A system capable of reasoning about CAD data offers the opportunity to substantially improve a design or a construction plan by providing feedback about an engineer's artifact. This paper...
Requirements of Object-Oriented Databases for Supporting Collaborative Engineering
Object-oriented programming is gradually evolving into a popular and standard paradigm for large software application development. Typical examples include computer-aided design and engineering...
Automating Project Scheduling?A Case Study
This paper describes the on-going development of a 'finite element' based, project planning and scheduling package which uses knowledge bases, inference engines,...
Knowledge-Based Construction Scheduling Support
Research efforts are underway to develop enhanced tools for construction scheduling support. Current work includes the development of an advisor system for considering schedule weather...
Return to search