Intake-Shoaling and Pump-Vibration Problems
Iowa Generation's Council Bluffs Unit 3 circulating water-intake structure has experienced two major problems: (1) formation of sand bars in front of the trash racks during...

Design of Selective Withdrawal Intake Structures
An overview is presented of the general methodology used by the U. S. Army Corps of Engineers in the design of selective withdrawal intake structures. Considered are the types of structures...

Report on Task Committee's Scope and Findings
A Task Committee for the Design of Outlet Control structures studied the state-of-the-art practices concerning the hydraulic function, water quality, public safety, maintenance and aesthetic...

Safety, Maintenance, and Aesthetic Considerations Associated with Outlet Control Structures for Stormwater Detention Ponds
Findings of the Task Committee for the Design of Outlet Control Structures, an ASCE Technical Committee, regarding maintenance, safety and aesthetic considerations for stormwater detention...

Design Accuracy of Stormwater Detention Basins
While the stormwater detention basin is the most frequently used method for controlling runoff from developing areas in the United States, there appears to be no statement of the probable...

Outlet Hydraulics vs. Storage Requirements
In many cases developers must use a portion of their land for temporary detention of storm runoff in order to comply with local ordinances. A simple method is outlined which yields the...

Evaluation of Two-Stage Outlet Hydraulics
A two-stage detention basin is an effective storm water management tool. This type of basin is designed to control two storm events and it will tend to perform better than a single-stage...

Detention Pond Outlet Design for Pollution Control
Stormwater runoff detention ponds were originally developed for the control of flooding and the designs of the outlet control structure must be modified to obtain pollution control objectives....

A Three Dimensional Hydraulic Jump
A study is conducted to define the three-dimensional hydraulic jump that occurs in a rectangular channel downstream of a rectangular contracted sluice gate. A sequent depth ratio equation...

Hydrology for River Management: The Belle River
Crop damages in recent years prompted farmers to back an effort to clean portions of a large inter-county drain. Other groups with conflicting interests pressed for a study of the impact...

Discharge Characteristics of Labyrinth Weirs
The hydraulic performance of labyrinth weirs is developed from data obtained from flume studies and site specific models. Using dimensional analysis, an equation for the discharge is developed...

Pipe Spillway Plunge Pool Design Equations
An equation is given to determine if scour holes will beach and widen excessively. For nonbeaching scour holes, dimensionless equations are given for the progression of scour with time...

Riprap Sizing-Four Methods
A comparison summary is provided for sizing of riprap by four methods: Isbash, Froude, Tractive Force - Logarithmic Velocity Profile (TFL), and Tractive Force - Power Velocity Profile...

Adjustable Speed Pumping for Irrigation Networks
Adjustable speed technology can be an economically viable method of accommodating the significant fluctuations in flow and pressure produced by certain irrigation networks. Combinations...

Avoiding Cavitation Damage to Hydraulic Structures
Cavitation damage often may be avoided by not allowing cavities to form. Where boundaries are not deeply submerged, their shape must be exactly correct, irregularities must be very small,...

Modeling Aeration Devices for Glen Canyon Dam
The 41-ft (12. 5-m) diameter tunnel spillways at Glen Canyon Dam experienced major damage during the 1983 spring runoff. This damage was initiated by cavitation. Hydraulic model studies...

Cavitation Inception from Cylindrical Holes
The inception of cavitation due to circular holes in a boundary is studied. Laboratory experiments were conducted to define limited cavitation as a function of the hole depth to diameter...

Prototype Studies of Corps of Engineers Structures Experiencing Cavitation Damage
A number of Corps of Engineers structures have sustained damage caused by the occurrence of cavitation. The damage has varied from slight pitting to severe erosion. The damage has occurred...

Aeration is the Solution for Sluice Cavitation Damage at Libby Dam, Montana
Cavitation has severely damaged two of the high-head flood control sluices. The damaged areas were immediately patched; however, these patches were not considered a solution to the problem....

Laboratory Studies of Cavitation in Corps of Engineers Hydraulic Structures
A selected bibliography of significant hydraulic laboratory research efforts by the U. S. Army Engineer Waterways Experiment Station to identify the likelihood of and means of preventing...

 

 

 

 