Application of Ice/Structure Interaction Concepts to a Real Time Ice Risk Assessment Computer Model
The successful and safe operation of an Arctic offshore exploration structure greatly depends on the implementation of alerts procedures. In order to assess alerts levels, a computer model...

Wang's Equation for Ice Forces From a Pressure Ridge
Yung-shih (Tony) Wang has presented an equation for the breaking loads from a multiyear pressure ridge on a conical structure. The three distances that define the position of the plastic...

Drifted Snow on Roofs
Drift snow loads on multilevel roofs account for about 75 percent of all snow load related roof collapses. A case history of snow drifts provides the foundation for a discussion of the...

Snow Fence Operational and Material Testing
The proliferation of snow fence products since the late 1970's presents an opportunity for optimizing the control of drifting snow. It also presents a challenge in discriminating...

Earth Walls: Making the Right Choice
Earth walls are retaining walls where the ground assumes a load-bearing role. These walls either support compacted earth (embankment-type reinforced compacted earth walls such as Doublewal...

New Support for Pin-Hanger Bridges
To promote safety of their bridges, many state highway departments are considering ways to add auxiliary support to existing pin-hanger bridges. The Pennsylvania DOT and its open-end consultant...

Design of Large Capacity Coal Silos for Service Life
Design and construction of Large Capacity Coal Silos for service life requires a careful consideration of the silo configuration as well as the material handling system. This paper presents...

Structural Renovation of Tall Chimneys
This paper describes several tall chimney projects where major renovations were performed to the linings which required complete structural analysis of the existing chimney and foundation....

Anchoring?A New Generation
During the time period of NRC Bulletin 79-02, and certainly afterwards, the use and application of wedge type anchors in Nuclear Power Plants took on a new perspective. The data gathered...

Interim Spent-Fuel Storage Options at Commercial Nuclear Power Plants
Although spent fuel can be stored safely in waterfilled pools at reactor sites, some utilities may not possess sufficient space for life-of-plant storage capability. In-pool storage capability...

Introduction to Structural and Mechanical Failure Modes for Nuclear Power Facilities
The three papers presented in this section discuss the types of information (i.e., dynamic tests, earthquake experience and analytical data) which are used in predicting the capacity of...

Properties and Environmental Impact of Stabilized Fly Ash
This paper summarizes the results of two research studies aimed at evaluating the properties and possible environmental effects of bituminous and lignite coal based fly ashes stabilized...

The Changing Legal Structure of Non-Utility Generation in the 1990's
Before actual construction of a small power production or cogeneration facility commences, numerous economic, technical and legal factors have been considered during the planning process....

Facing the 21st Century with an Aging Hydro System
The Tennesse Valley Authority (TVA) has implemented a comprehensive study of their hydroelectric plants in order to extend their service life for the next 50 years into the 21st century....

Dam, Spillway and Hydropower Rehabilitation
Many older dams are in need of rehabilitation as a result of aging, deterioration, and more stringent safety standards. Current deficiencies include deterioration of original construction...

Hydro Rehabilitation?Innovative Solutions
Most hydro facilities have been in operation for many years and, consequently, must periodically have been rehabilitated. The high cost of energy, labor, materials, and financing dictate...

Brule Project Spillway Rehabilitation and Expansion
Brule Hydroelectric Project is located near Florence, Wisconsin, on the Brule River about 1.5 miles upstream of its confluence with the Michigamme River. The 80 year old dam developes...

Automation of Union Electric's Hydro-Power Plants
Union Electric Company is spending twelve million dollars on Electronic Control and Monitoring equipment at two of their hydro-electric plants (a total of twenty-seven generating units)...

Fly Ash in Roller Compacted Concrete Pavement
This paper presents the state of practice on the use of fly ash in roller compacted concrete (RCC) pavements. Placed using asphalt pavers and compacted using asphalt rollers, RCC pavement...

Superplasticized High-Volume Fly Ash Structural Concrete
This research was carried out to develop structural grade concrete containing high-volumes of ASTM Class C fly ash. A Portland cement concrete, proportioned to have 28-day compressive...

 

 

 

 