Sons of Martha
Civil Engineering Readings in Modern Literature
Sons of Martha:Civil Engineering Readings in Modern Literature explores the history and heritage, the people, the projects and the ethics involved...

A User's Guide to Federal Architect-Engineer Contracts
The User's Guide to Architect Engineers Contracts explores the process of selecting architect-engineer firms to perform design...

Expert Systems for Civil Engineers
Education
While the technology of expert systems can provide engineers with another approach to the development of computable models for civil engineering problems, it is not clear what a course...

Transactions of the American Society of Civil Engineers 1988
Transactions of the American Society of Civil Engineers Vol. 153, 1988 contains abstracts for all ASCE journal papers and technical notes,...

ASCE Annual Combined Index 1988
The 1988 ASCE Annual Combined Index provides a guide to materials appearing in publications of ASCE published during 1988. This includes papers and technical notes from ASCE technical...

Journal of Materials in Civil Engineering
The Journal of Materials in Civil Engineering covers the development, processing, evaluation, applications, and performance of construction materials in civil engineering....

Microcad: Pushing the Limits
Several engineering projects are covered which illustrate the increasingly complex design applications being accomplished with microcomputer based software. A dam, an apartment complex,...

Future Hydropower Development
Hydropower development and management in an era of uncertainty is the theme of this Waterpower '87 conference and reflects the current mood of the U. S. hydropower development...

Expansion of Three Plants on the Saranac River
The capacity of three cascading hydro power plants, owned and operated by New York State Electric and Gas Corporation on the Saranac River near Plattsburgh, was expanded by a total of...

Selection of Jim Falls Turbine Generators
The selection of the unit configuration for the Northern States Power Company's Jim Falls Hydro Redevelopment Project was based on an extensive evaluation of various turbine...

Movable Dam?Gate Selection Procedure
Very few new dams are now being considered, particularly for waterpower and even more specifically for low head waterpower in the lower reaches of major rivers. The City of Harrisburg,...

Case Study on the Development of a Hydro License Compliance Monitoring System
As the holder of 29 Federal Energy Regulatory Commission (FERC) licenses, Pacific Gas and Electric Company (PGandE) has an obvious need to monitor and document compliance with the numerous...

Fish Mortality at a New Low-Head Hydroelectric Plant
A study was developed for the Morrow Plant to investigate the potential for turbine related mortality of entrained fish. Morrow Lake supports a small sport fishery, mainly for smallmouth...

The Use of Time Series Analysis to Estimate Flow Duration Curves to Assess Energy Potential for Low Head Hydro Redevelopment
The proposed hydroelectric site location has a low head potential making discharge the primary energy production component. A flow duration curve (FDC) study was commenced to generate...

Appropriate Design and Construction of Conduits for Small and Mini Hydropower
The success of smaller hydro schemes often lies in identifying feasible and economic waterway systems to develop relatively high heads between low intake weir and powerstation. This paper...

Designing a Modern Small-Scale Hydroelectric Plant
STS Consultants, Ltd. (STS) and Skidmore, Owings & Merrill (SOM) successfully teamed on four hydropower sites in Michigan during the 1980's. Three of the four sites...

Status and Prospectives of Small Hydro Power Development in Egypt
The paper describes the current status of hydropower development in Egypt and its future prospects. Emphasis is made on reviewing the potentialities for small, mini and micro-hydropower...

Design of Siphon Penstocks for Low Head Hydros
Siphon penstocks have been designed and constructed at Jim Falls and Winter, Wisconsin at existing dams. Both hydropower projects are located on the Chippewa River. The design of these...

Rock Engineering at Cat Arm Hydroelectric Development
Cat Arm Hydroelectric Development in Newfoundland, Canada, develops 129 MW from 384 m of head. The project was constructed between 1981 and 1984 and comprises 5 large dams, 5 small dams,...

Adapting Tunneling to Rocks of the Sierra Nevada
Exploration programs were completed to select the most economical tunnel routes which are not only the shortest but are those which can be excavated by tunnel boring machines with the...

 

 

 

 

Return to search