RRR Design Standards: Cost-Effectiveness Issues
The Transportation Research Board study of geometric design standards for RRR projects is currently trying to match the logic of cost-effectiveness to the mostly judgmental process of...

Bounded State Control of Structures with Uncertain Parameters
The control of linear systems in the presence of set constrained external disturbances has been investigated maintaining the states in a prespecified region by estimating the maximum reachable...

Dynamic Behavior of Full-Scale Wood Diaphragms
Experimental testing of full-scale wood diaphragms has been performed at Washington State University to determine basic dynamic properties. Ten diaphragms, including walls, floors, and...

Engineering Laboratories' Role in Quality
Quality construction of a quality design is one goal which Owners, Design Professionals, and Contractors can all agree is needed if the project is to be truly successful. The Engineering...

It's Only Visual Inspection (Welding Inspection)
Unless specified otherwise in the Contract Documents, Visual Inspection will be performed on all fabrication/erection welding for projects that utilize the Specifications for the Design,...

Development of Second Generation Plasticized Sulfur Binders as a Paving Material
Plasticized sulphur is produced when melted sulphur is reacted with selected hydrocarbons to produce polysulfides. These polysulfides help retain a 'polymeric'...

Monitoring a Bridge's Pulse
The Sunshine Skyway Bridge, which collapsed in 1980, is being replaced by the Florida Department of Transportation. The new Sunshine Skyway Bridge, which spans Tampa Bay between Bradenton...

Alternative Dispute Resolution
Usually it takes far less money and time to resolve a construction dispute if a lawsuit and court trial can be avoided. In the mini-trial, te two or more parties agree to radically reduce...

The Parking Problem
Corrosion of parking garage decks has become a multi-billion dollar problem, caused primarily by deicing salts that seep into the concrete and attack reinforcing steel. Design and construction...

Cold Regions Engineering
Engineers who plan, design, construct, operate and maintain facilities in cold regions must deal with all the concerns found in the more temperate areas of the world in addition to the...

Pavement?An Integral Part of the Terminal as a Container Handling System
A modern container terminal requires extensive areas of paving for stacking and moving containers, the provision of which often proves to be one of the most expensive single items, in...

U.S. Navy's First Double Deck Pier
The present single level concept of pier construction limits the pier-side service to the fleet. With the ever increasing requirements for utilities to the ships, and maintenance and training...

Construction Approaches to the Navy's Floating Pier Concept
The subject of this paper is a floating pier which is currently under evaluation as a more cost-effective solution for berthing Navy ships. This new approach to pier design was sponsored...

Port Master Plans and Feasibility Studies
Port projects are cost-intensive long-life irreversible assets, and developing countries particularly limping with resource constraints could not afford the luxury of short-sighted defective...

Pavement Design for a Break Bulk Terminal Yard
This paper discusses the practical application of mechanistic pavement design principles for a proposed 8. 1 ha break bulk cargo storage yard that is part of the Port of Portland's...

Roller Compacted Concrete Pavement for Marine Terminals
This paper describes recent intermodal yard paving projects at the Port of Tacoma, Washington which have utilized a relatively new paving process known as Roller Compacted Concrete (RCC)....

Design of Wharf Facilities, Guam, M.I., to Accommodate Difficult Site Conditions
A wharf facility currently under construction in Guam, Mariana Islands, for the U. S. Navy utilizes precast concrete box caisson construction to satisfy difficult site conditions. To reduce...

Tacoma Sea-Land Terminal: A Project Management Challenge
The Port of Tacoma completed a new two berth container terminal and intermodal yard for Sea-Land in May 1985 in only 26 months after signing a binding agreement. The project, which also...

Conversion of Keppel Wharves Conventional Berths 42 & 43 to Container Berths C13 and C14, Singapore
With further growth of container traffic expected in the 80's the need for additional facilities was apparent. Following an evaluation of available alternative sites, it was...

Tacoma Terminals Pier Designed for Economy
This pier is a representative and highly refined sample of what is known as the Puget Sound system of construction, an economical system that maintains the durability necessary in the...

 

 

 

 

Return to search