Consideration of Sedimentation on Hydropower Projects
Experience gained by analysis of a number of hydropower projects throughout the world leads to the conclusion that it is necessary to consider sediment related aspects in the design and...
The Stabilization of Minidoka Powerplant and Dam
The rehabilitation of structures can pose numerous challenges to the engineer. The structure historical preservation, the benefit cost ratio of the rehabilitation, and the stability of...
Bishop Intake #2 Spillway Modifications: A Case History
This paper covers the history of the events leading to the modification of Southern California Edison's (SCE) Bishop Intake 2 to pass a site specific design flood. From the...
The Replacement of Penstocks at TVA Ocoee II Power Plant
The Tennessee Valley Authority (TVA) replaced the steel penstocks at its Ocoee II power plant near Ocoee, Tennessee. A total replacement was necessary because of severe corrosion on the...
Rehabilitation of the Dams at the Crescent and Vischer Ferry Hydroelectric Projects
This paper reviews the dam rehabilitation design and construction techniques used at the New York Power Authority's Crescent and Vischer Ferry Dams. The following are the...
Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...
Civil Design of the Sidney A. Murray Jr. Hydroelectric Station
This paper addresses the general civil design of the Sidney A Murry Jr Hydroelectric Station with special emphasis on the design requirements of the project's unconventional...
Evaluating History?The Edison Sault Powerhouse
The hydroelectric facility owned by the Edison Sault Electric Company at Sault Ste Marie, Michigan was an engineering marvel when it was designed and constructed. This paper explores the...
Avoiding Vibration in Penstocks
One objective of this paper is to indicate the potential sources of pressure pulsations within a hydraulic conduit system and the range of forcing frequencies associated with these sources....
Hydraulic Design and Development of Propeller Replacement Runner for R. H. Saunders
This paper outlines the hydraulic design for the R.H. Saunders replacement runner. The six-bladed propeller runner was numerically optimized based on 3-dimensional flow simulation. After...
Hydraulic Transients in the Operation of Small Hydro Plants
Adequate governing stability is a primary consideration for most large hydroelectric generating units. However, almost all small units installed recently in the United States are intended...
Manasan Ice Control Structure Rehabilitation & Bypass Designs
Ice control works built on the Burntwood River at Manasan Falls were damaged during the 1985 spring break-up. The ice boom had broken and the lowered pond level indicated that the rockfill...
Modernization of the Schoolfield Dam Hydroelectric Powerhouse
This case study describes the retrofitting of a turn-of-the-century powerhouse with modern turbine/generator equipment. The structure consists of numerous turbine bays separated by massive...
Sidney A. Murray, Jr. Hydroelectric Power Plant Turbine Hydraulic Design and Testing
This paper describes the project design concept, highlighting the choice of turbine type and capacity. Model testing and analysis of control by downstream gate is an important feature...
Modernization of Hydroturbines?New Approach to Effectiveness, Reliability, Environment
Renovation of hydraulic turbines is one of the major lines in LMZ production and is aimed at rehabilitation of hydroturbines and increasing efficiency, rated output and energy production....
Dillon Hydroelectric Project Performance Versus Expectations
The Dillon Hydroelectric Project was commissioned in 1987. Design and construction are briefly described; plant availability is compared with design expectations; and maintenance costs...
Design Concepts for Vertical Kaplan Turbines
In this paper, some general aspects as well as selected design details of vertical Kaplan turbines are presented. The Monroe Street project which is under construction right now serves...
Decision Support for Colorado River Operations
The United States Bureau of Reclamation (Reclamation) uses a simulation model known as the 24-month Study Model for planning monthly and seasonal operations for the Colorado River Basin....
An Overview of the Latest Developments in the Modernization, Upgrading and Rehabilitation of Existing Hydraulic Turbines
The growth experienced in the 1980's in the modernization of older hydro plants has fueled the development of new runner and wheelcase designs and modifications providing...
Pressure-Time Method Using Modern Practices
Over the past twenty years, Hydro-Quebec has modernized the pressure-time method of flow measurement, a method which is generally economical but sometimes difficult to apply. Starting...
Return to search