Catch the Wind
Wind turbines can now produce energy that is cost-competitive with other, more conventional power generation methods. The increased efficiency is due in part to the turbines'...
Geo-Engineering for Underground Facilities
The papers collected in this proceedings
The Train to the Plane
Getting to New York's John F. Kennedy Airport is an urban nightmare. The Port Authority (PA) of New York and New Jersey, which operates the airport, has wrestled with proposals...
Stream Stability and Scour at Highway Bridges
Compendium of Stream Stability and Scour Papers Presented at Conferences Sponsored by the Water Resources Engineering (Hydraulics) Division of the American Society of Civil Engineers
Sponsored by the Water Resources Engineering (Hydraulics) Division of ASCE. This collection contains 75 papers and 321 abstracts presented at conferences...
Tunneling under Trains
The Singapore deep tunnel sewerage system consists of a 90 km long tunnel network that will convey wastewater by gravity flow to two new secondary treatment plants being planned for the...
Conquering the Cold
Three projects�a water treatment plant, an airport, and a hydroelectric plant�illustrate how practicing engineering in Alaska differs from working in the contiguous 48 states. Permafrost,...
Cold Regions Engineering
Putting Research into Practice
This proceedings,
Pipeline Safety, Reliability, and Rehabilitation
This proceedings,
Who Provides Inspection
With the increasing interest in the design-build project deliver system, the decision of who should be responsible for quality assurance/quality control has become a complex one. To assist...
Managing the Megaproject
The Mon/Fayette Expressway and Southern Beltway will link Pittsburgh, Pennsylvania and Morgantown, West Virginia via a 104 km, $3.5 billion Y-shaped highway. With the project split into...
All Eyes on I-15
The largest single highway construction contract in United States history is currently underway in Salt Lake City, Utah. The Utah Department of Transportation's innovative...
Special Geotechnical Testing: Central Artery/Tunnel Project in Boston, Massachusetts
The Central Artery/Tunnel Project (CA/T) in Boston, Massachusetts, is the largest urban highway construction project in the history of the interstate system. The magnitude and complexity...
Safe Passage
Past studies have indicated that the existing juvenile fish bypass system at the second powerhouse located at the Corps of Engineers' Bonneville Dam on the Columbia River...
A Race Against Time
The coastal hillsides of San Mateo County, California, were quickly developed during the post WWII construction boom. Although the land is prized for its scenic beauty, the underlying...
Evaluation of the SSL MSE PlusTM Retaining Wall System
Prepared by the Highway Innovative Technology Evaluation Center (HITEC), a CERF service center. This report describes a HITEC evaluation designed to...
Construction Control for Earth and Rockfill Dams
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers, No. 27 This manual provides critical guidance for constructors...
Seattle Solutions
Many of Seattle's most important bridges are vulnerable to serious damage if a much-anticipated big earthquake hits. A city-wide study designated lifeline structures for retrofitting,...
Sealing the Subway
Although work on the Los Angeles Metro subway is stopped for now, the project has introduced a number of innovations and advances to the American tunneling community, including the use...
Preparing Specifications for Design-Bid Build Projects
The Committee on Specifications of the Construction Division of ASCE has developed a guide to preparing construction specifications for design-bid build projects. The guide contains preparation...
Consulting Engineering
A Guide for the Engagement of Engineering Services
Return to search