Friant Power Project: Design and Construction?Non-Federal Power at a Reclamation Facility
Friant Dam, Millerton Reservoir, provides the principal water supply for the Friant Division Central Valley Project of the U. S. Bureau of Reclamation (Bureau). The dam is a 319-foot high...

Safety of Dams Activities in the Bureau of Reclamation Lower Colorado Region
In the Lower Colorado Region of the Bureau of Reclamation (BuRec), there are presently eight BuRec dams and one Bureau of Indian Affairs dam being modified or studied for modification...

The Pacific Texas Pipeline Project?Deepwater Oil Terminal, Port of Los Angeles
This paper describes the implementation program and status of the Pacific Texas Pipeline Company project in the Port of Los Angeles. A brief description of this important 1. 6 billion,...

Subsidence by Rising and Fluctuating Ground Water
Present studies by the U. S. Bureau of Reclamation in California indicate that under certain geologic conditions similar subsidence can also be caused by rising ground-water levels, which...

Deferred Drainage?Prudent Policy or Tactical Folly?
The practice of deferring drains has not always worked out as planned. This is particularly true of large outlet drains such as the San Luis Drain in the Central Valley of California and...

Gully Incision Prediction on Reclaimed Slopes
An investigation was conducted to estimate the potential of gully intrusion into reclaimed waste impoundments. A series of eight reclaimed impoundments exhibiting gully intrusions were...

Evaluation of Tertiary Wastewater Treatment Systems
The purpose of this paper is to evaluate factors affecting the optimum operations of coagulation-flocculation and filtration processes in municipal wastewater reclamation and reuse. Special...

Reusing Treated Wastewater for Irrigation of Raw-Eaten Vegetable Crops in Monterey County, California
The demonstration project was entitled the Monterey Wastewater Reclamation Study for Agriculture (MWRSA). It was principally a field trial study of the feasibility of irrigating food crops...

Effects of Artificial Recharge on Ground-Water Quality, Long Island, New York
Artificial-recharge experiments were conducted at East Meadow in central Nassau County, Long Island, N. Y. , from October 1982 through January 1984, to evaluate the degree of ground-water...

Sedimentation in the All-American Canal
During the planning for the All-American Canal, by the U. S. Bureau of Reclamation as part of the Boulder Canyon Project, works were designed at the head of the canal to remove between...

Land Renewal with Topsoil from Clyde Port Dredgings
The paper examines the potential of using sediment dredged from the River Clyde estuary as a topsoil in land renewal. It presents results, to date (1986), of a study sponsored by the Scottish...

El Paso vs New Mexico, Ground Water or Other Options
The City of El Paso proposed to drill numerous water wells near the Texas-New Mexico and Mexico-New Mexico borders to supplement their water supply during the years 2000-2020 and thereafter....

Evolution of Water Organisations in England and Wales
Although by the early 1960's there was in existence a large body of legislation dealing with water matters, the Water Resources Act 1963 provided for the first time a significent...

Design Criteria for Mass Culturing Spirulina Algae
One extract of Spirulina, developed by Dr. Christopher Hills has been used as a nutrient for cell cultures and contains a growth factor called Spirulina Growth Factor. Another extract...

U.S. Bureau of Reclamation Use of Risk Analysis
The United States Bureau of Reclamation (USBR) has been using risk analysis techniques in assessments for management decisions. Before presenting USBR practice and experience, the paper...

Cyanide Heap Leaching Problems at Elk City, Idaho
A cyanide heap leaching operation for gold recovery was started in 1983 above the water intake for the community of Elk City in north central Idaho which turned into a problem during the...

Seepage Control for Embankment Dams USBR Practice
The current Bureau of Reclamation approach to seepage assessment, analysis, and design for embankment dams is described. The advantages and appropriate applications for the analysis programs...

Computer Applications in Grouting
The first use of computers during foundation grouting was tried by the Bureau of Reclamation on Ridgeway Dam in Colorado. It was very useful in monitoring real time down hole conditions...

Optimizing Computer Aided Planning
Computer aided planning may fail if new or untried computer programs or new equipment is used when time is limited. Eleven leadership skills helped the Utah Projects Office, US Bureau...

Computer Model for Wastewater Reclamation
This paper describes how an efficient computer model can be constructed and used to evaluate planning options for wastewater reclamation. The situation in the City of Scottsdale, Arizona,...

 

 

 

 

Return to search