Pit Turbines, an Economical Solution for Low Heads
The paper describes the experience with pit turbine design and construction at the 8 MW St. Cloud facility located on the Mississippi River in Minnesota. Major topics in the paper include...
Acoustic Flowmeter/Efficiency System Installation at the Niagara Power Project
The New York Power Authority's Robert Moses Niagara Power Project (RMNPP) recently installed an acoustic flowmeter/efficiency system on two 150 MW rated generators. This paper...
Field Efficiency Testing of Hydroelectric Turbines
The wide variability of conditions encountered in field testing of turbines is illustrated by examining two case studies with widely different scenarios. One site involved field acceptance...
Turbine Efficiency Measurements by the Pressure-Time and the Current-Meter Method at Paugan
Paugan generating station was built in the 1920s. Although the generators were converted from 25 Hz to 60 Hz in the mid 1950s, the original runners were in place until recently when a...
Design and Efficiency Testing of a Cross-Flow Turbine
An inexpensive American-made cross-flow turbine was designed, manufactured, and installed at a remote run-of-river site in Northern California. The 400 kW unit includes an innovative automatic...
Planning and Operation of Hydropower Development on a Navigation System, a Case Study
This paper examines the steps taken to optimally develop the hydropower plant at Lock and Dam No. 13 on the Arkansas River as part of an existing multiple use system. The specific items...
320 KW Hydro Power Plant for Tenwek Hospital, Kenya, East Africa
Due to increasing demand for medical care and growth of hospital and staff facilities, a less costly source of electrical power was needed for the Tenwek hospital to replace the diesel...
Turnkey Hydropower at St. Cloud
The St. Cloud Hydroelectric Project is located at an existing dam on the Mississippi River in St. Cloud, Minnesota. The project consists of a two-gated spillway and an 8.6-megawatt powerhouse...
Nanpil River Hydropower Project
The Nanpil River Hydropower Project is located on the island of Pohnpei in the Federated States of Micronesia, East Caroline Islands located in the Pacific Ocean. The project consists...
Harnessing the Allegheny: Four Low-Head Projects
The navigable portion of the river, extending northeast of Pittsburgh approximately sixty miles, contains eight lock and dam systems under the jurisdiction of the U.S. Army Corps of Engineers...
Paradise River, a Challenging Small Hydro Development
The frequent assumption that small hydro developments are simple is not always borne out in practice. A case in point is the Paradise River Development in Newfoundland, Canada. This paper...
Harnessing the Snake: A Construction Viewpoint
The Gem State Hydroelectric Project, five miles south of Idaho Falls, Idaho on the Snake River, consists of a 900-foot-long, 40-foot-high dam; approximately four miles of earthend dikes;...
Modeling Sedimentation Problems at Hydro Developments
Sedimentation embodies the processes of erosion, transportation and deposition of sediments. At hydro developments, sedimentation can create problems. Computer sedimentation models (CSM's)...
Visualization of Flow Phenomena in a Hydraulic Turbine Based on 3D Flow Computations
The fluid flow in a Francis turbine has been analysed theoretically. Advanced techniques have been used for both the flow calculation and the presentation of the results in order to clarify...
Experience with the Application of Fully 3D Potential Flow Analysis to Runner Design
Hydraulic turbines come in various shapes and types depending on their operating conditions. Their performance characteristics depend largely on the runner which is the most difficult...
Renewal of the Burt Dam Generating Station
The present redeveloped hydro facility operates as a 300 kW run-of-river station automated by a head pond level controller which adjusts turbine setting to match available river discharge....
Quick Response on the Mississippi
In November 1987, the Mississippi River broke through the foundation of the St. Anthony Fall's Lower Dam Hydropower Plant. The plant's owner, the Northern State...
Storing Sediment and Freeing Fish
When Mount St. Helens erupted in May 1980, it sent a river of pyroclastic ash and other debris into Washington's North Fork Toutle River Valley. The resulting debris pile...
Hydraulic Engineering
The papers in this book were presented at the ASCE National Conference on Hydraulic Engineering in August, 1989 at New Orleans, Louisiana. The objective of the Conference was to provide...
Sediment Transport Modeling
This is the Proceedings of the International Symposium on Sediment Transport Modeling, held in New Orleans, Louisiana, August, 1989. It reviews the state of the art and presents the latest...