Structural Design, Analysis and Testing
This volume contains the papers presented in 21 sessions of the 1989 Structures Congress held in San Francisco. The papers cover a wide range of topics including types of construction...

Radon Resistant New Construction Practices
This paper highlights the basic principles for building radon-resistant houses and it groups the construction techniques into four categories, i.e., the barrier approach, soil ventilation...

Pressure Differences Affecting Radon Entry in New Residential Construction
Various conditions in a house can commonly produce house negative pressures up to 20 Pascals relative to the soil gas pressure. Depressurization of the house relative to the soil gas will...

Cost of Radon Control Measures in New Construction
Installation of a radon prevention system in new construction increases costs to builders and to homebuyers as well. Builders and/or their engineers will need to assess different approaches...

Economic Impacts of Storm Sewer Design Criteria
This paper discusses the selection of storm sewer design criteria and the resulting economic impacts. Using the Rational Method for calculating design flows, an investigation was made...

Flood Impact and Management of Levees in Tennessee
The construction of private levees is causing flooding and erosion problems along several tributary rivers in West Tennessee. The severity of these problems is recognized by the State...

Highway Erosion Remedial Measures
Soil erosion from highway ditches, cut slopes and fill slopes present a continuous problem to roadway designers, geotechnical engineers, and construction and maintenance personnel from...

Cold Regions Engineering
This volume contains papers that were presented at the 5th International Cold Regions Engineering Specialty Conference, sponsored by ASCE and held in St. Paul, Minnesota, February 6-8,...

Water Quality Monitoring of Highway Construction
The primary objective of water quality monitoring, as it relates to highway construction, is to obtain quantitative information to ensure that runoff from the construction site does not...

Design, Construction and Testing of Repairs to the Low Level Outlets at Terzaghi Dam
Operation of the low level outlets (LLOs) at Terzaghi Dam in southwestern British Columbia resulted in severe cavitation at operating heads significantly lower than design. Modifications...

Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...

Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...

Challenging Site Conditions Lead to Unusual and Innovative Powerhouse Design Features
Pacific Gas & Electric Company's recently completed Newcastle Powerhouse is located on the shore of Folsom Lake near Auburn, California. The $26 million facility uses...

Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...

Design of Steel Tunnel Liners
The paper presents a detailed development of the fundamental equations for internal pressure design, considering an elastic interaction between the steel liner and the surrounding rock...

Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...

Cofferdams: An Integral Part of Small Hydro Design
Cofferdam construction costs can be a major factor in the viability of a small hydro development. For this reason, cost-effective design and construction are critical. A cost-effective...

Flashboard Alternatives Including Rubber Dams
This paper reviews some common flashboard methods used in the northeastern part of the U.S., and discusses the advantages and disadvantages of each type. The inflatable rubber dam is presented...

Hydraulic Features of Canyon Lake Hydropower Plant
The original hydraulic features of the Canyon Lake dam were well adapted to the addition of hydropower. Design, construction and anticipated operational details of the added hydropower...

Effects of the Environmental Approval Process on Project Scheduling and Economics
The environmental approval process is fundamental to the permitting of hydropower projects. Recent changes in permitting requirements has had a significant effect on the cost and schedule...

 

 

 

 

Return to search