Development of Standards for Slipform & Jumpform Works
Review of past work indicates substantial effort has been made to publish construction standards and guidelines for slipforms but published material pertaining to jumpforms is scarce....
Temporary Structures for Protection and Access
Temporary Structures in Construction Projects (TSC) are utilized for three (3) purposes A. Support (of the structure being built or adjacent structures or utilities) B. Protection (of...
Who Pays for the Unexpected in Construction
The problem of who pays for the unexpected in construction is discussed in relation to the testing and inspection of construction materials. Laboratory is often blamed for poor construction...
Construction Product Performance, The Unexpected
Efforts made in the construction, industry to increase the quality of the constructed facility through the development of new materials and systems and through the reduction of labor intensive...
Laboratory and Field Research in Construction Automation
This paper presents a series of research projects to build and test prototype systems. It has been found that prototyping provides an economical approach to support both basic and applied...
The Virtual Design Team: An Object-Oriented Model of Information Sharing in Project Design Teams
The Virtual Design Team (VDT) is an object-oriented, discrete event simulation of a multidisciplinary design team in action. The VDT models a design task as a network of design and design...
Computer Data Exchange Using National and International Standards
There is a need within the construction industry to electronically transmit standard documents between designers, owners, contractors, and material suppliers. Ideally, the transmission...
Construction Inspection Responsibility from the Viewpoint of a General Contractor and Construction Manager on a GMP Project
Absent local laws to the contrary, any member of the construction team, the Owner, Architect, or Contractor, can theoretically arrange for and provide any testing and inspection that may...
Seismic Design Issues for Immersed Tube Tunnels
This paper provides an overview of the issues and the state of the art techniques in the seismic design of immersed tube tunnels (ITT). Particular focus is given to the ITT presently planned...
Construction Technology/Method Identification and Selection System
The proliferation of construction technology and the characteristics of technology information, such as complexity, interdependency, etc., pose the need for a well-organized technology...
Integration of CAD and Material Control
The purpose of this paper is to address the relationship between CAD (Computer Aided Design) drawings and the material control software. Computer generated drawings have the ability to...
Building Green
Some scientists say polystyrene insulation may be responsible for up to 40% of the ozone depletion caused by CFCs. That's only one reason why construction and design professionals...
Future Fill-Up
The car rental agencies at Phoenix Sky Harbor Airport have combined their service/filling facilities in the new terminal's parking garage. This permits customers to pick up...
Effect of Temperature on Gas Transfer at Low Surface Renewal Rates
In order to investigate the dependence of gas transfer coefficients on temperature under conditions of low surface renewal rates, laboratory experiments were conducted using simultaneous...
Tracer Gas Transfer Technique for Shallow Bays
Developmental field tests using propane and Rhodamine WT tracers were conducted to adapt the tracer gas method for use in shallow bays. A special injection box was built to prevent mixing...
Gas Transfer Measurements on an Ice-Covered River
Wasteload allocation for existing and proposed pulp mills in the Athabasca River Basin of northern Alberta, Canada, necessitated measurement of the atmospheric reaeration rate, K2,...
Field Tests on a Bubbleless Membrane Aerator
A novel bubbleless hollow fiber membrane aerator has been developed and tested for the oxygenation of water. In this process pure oxygen is maintained on the inside of a bundle of sealed,...
Designing Better Hollow Fibre Contactors
In this paper we calculate optimum hollow fibre module designs for gas absorption by maximizing the mass transferred per unit cost. Two costs are considered; the membrane cost and the...
Symposium on Ground Water
This proceedings,
Quake-Safe Housing, Again
Because so little data exist about earthquake behavior of buildings that have been strengthened to meet seismic codes, many engineers are curious about the Hotel Oakland in California...