Modeling Sedimentation Problems at Hydro Developments
Sedimentation embodies the processes of erosion, transportation and deposition of sediments. At hydro developments, sedimentation can create problems. Computer sedimentation models (CSM's)...

Analysis of Unsteady Flows in Irrigation Canals Due to Load Rejection in Hydroelectric Project
An add-on hydroelectric project has been proposed for the Owyhee Tunnel No. 1, a component of the Owyhee Irrigation Project constructed in the 1930's by the U.S. Bureau of...

Foundation Engineering
Current Principles and Practices
The proceedings of the 1989 ASCE Foundation Engineering Congress (entitled Foundation Engineering: Current Principles and Practices) address advances in the state-of-practice and in research...

Predicted and Observed Axial Behavior of Piles
Results of a Pile Prediction Symposium
This publication presents the results of a pile capacity event that was held at the Lakefill site on the Evanston Campus of Northwestern University in conjunction with the 1989 Foundation...

Glitches in Flitch Beam Design
Wiesenfeld proposes a set of design criteria for flitch beams. These beams, in which wood and steel sections are bolted together to act as a single structural unit, are currently covered...

Storing Sediment and Freeing Fish
When Mount St. Helens erupted in May 1980, it sent a river of pyroclastic ash and other debris into Washington's North Fork Toutle River Valley. The resulting debris pile...

Sediment Transport Modeling
This is the Proceedings of the International Symposium on Sediment Transport Modeling, held in New Orleans, Louisiana, August, 1989. It reviews the state of the art and presents the latest...

New Roof for an Aging Temporary
The wartime temporary design of a 1942 industrial building justified use of green timber for its roof trusses and higher than usual allowable design stresses. Some 45 years later, a new...

Resilient Moduli of Soils
Laboratory Conditions
Historically, structural pavement design has been based on static testing techniques, such as the CBR. More recently, the profession has placed increased emphasis on repeated load testing...

Beam-Supported Slabs Subject to Edge Loading
A model is presented which allows a designer to estimate stiffnesses required to provide a given critical buckling load in beam-supported slabs subjected to biaxial edge loading, such...

Hydro Development on the Huallaga River in Peru
The proposed Chaglla Hydroelectric Project, is located on the Huallaga River in Central Peru, about 300 km north east of Lima. The available gross head of 870 m and regulated flow of 58...

Probabilistic Capacity Value of Nonfirm Hydro Energy
Electric utilities with a predominant mix of hydro generation traditionally apply Energy Planning criteria rather than Capacity Planning criteria in developing their generation resources...

Glen Canyon Environmental Studies Resource Response Analysis
The primary objective of the Glen Canyon Environmental Studies is to determine how the resources of the Grand Canyon respond to the operations of Glen Canyon Dam. Two levels of analysis...

The Effect of Sedimentation on Hydro-Developments
This paper will discuss two major impacts which are the hydro construction on natural stream sedimentation and the sedimentation related problems during hydro operation. The two types...

Improving Design of Small Hydro Plants
One objective of this paper is to show why certain features of many small hydro plants have given poor operational performance or experienced expensive maintenance problems. A second objective...

Milltown Powerhouse Rehabilitation
The Milltown Powerhouse and dam are over 80 years old. The powerhouse and other structures were built in 1906 and are owned by the Montana Power Company. The plant is located on the Clark...

Design of Siphon Penstocks for Low Head Hydros
Siphon penstocks have been designed and constructed at Jim Falls and Winter, Wisconsin at existing dams. Both hydropower projects are located on the Chippewa River. The design of these...

Turbine Intake Modification for Fish Passage
This paper describes one solution the U. S. Army Corps of Engineers has found to improve juvenile fish guidance at Bonneville Second Powerhouse on the Columbia River. Juvenile fish passage...

Design and Operation of a Differential Surge Tank
The differential type of surge tank is more effective in operation than the simple type because it reacts more quickly to load changes of all sizes. The differential tank is also usually...

Generators with Shaft Mounted Turbine Runners
Water turbine runners mounted on an extended generator shaft are often specified to eliminate turbine bearings and the flexible shaft coupling. Two bearing single shaft turbine generator...

 

 

 

 