Effect of Lead Shielding on Small Cask Criticality
A study was performed to evaluate gamma shield effects on criticality safety for two modern legal weight truck casks. The lead gamma shield of a small spent fuel shipping cask increases...
Durability Testing of the High-Capacity GA-4/GA-9 Trailer
General Atomics (GA) is under contract to the US Department of Energy (DOE), Idaho Field Office, to develop two legal-weight truck from-reactor spent-fuel shipping casks with trailers....
Simulating Paving Fleets with Non-Stationary Travel
Proper selection of equipment and fleet size can yield substantial savings in both time and cost. A simulation model of asphalt-paving operations is presented and impacts of non-stationary...
Large Truck Impacts on the Highway Infrastructure: The Bridge Dimension
Recent U.S. studies have explored the productivity gains of longer combination vehicles (LCV's) and their impacts on highway infrastructure. The area least explored is LCV operations and...
Implications of Uncertainty in Transportation Control Measures: A Case Study of the Los Angeles Truck Management Program
The Los Angeles Department of Transportation has proposed a peak period travel restriction aimed at heavy-duty trucks on all Los Angeles streets. The ordinance is designed to reduce the...
The Technology of X2000?ABB's High Speed Tilting Train
The X2000 High Speed Tilting Train was developed by Asea Brown Boveri (ABB) in cooperation with the Swedish State Railways (SJ). The purpose of the project was to reduce trip times on...
IVHS: Applications in Freight and Trucking Operations
This paper discusses the application of IVHS technology to freight and trucking activities. It is argued that because commercial vehicle operators perceive real benefits from IVHS, they...
Establishing a Human Factors Focus and Approach for North Carolina's IVHS Efforts
The paper discusses the behavioral and human factors issues associated with the development and operation of North Carolina's CARAT program (Congestion Avoidance and Reduction for Autos...
All Dressed Up
Its location at 660 Madison Avenue will put the new home of clothier Barneys New York in the heart of Manhattan's exclusive midtown shopping district, but the $120 million...
Exchanging Wastes
For several years, thousands of cubic yards of dried sludge have been stockpiled at the Greater Peoria Sanitary District's wastewater-treatment plant in Peoria, Ill., because...
Concepcion Dam Design & Construction Problems and Their Solutions
Concepcion Dam is a curved axis gravity structure 68 m high and 695 m long. It supplies water to Tegucigalpa, the capital of Honduras. The dam contains 290,000 cubic meters of RCC. Challenges...
Nondestructive and Destructive Testing of a Three Span Skewed R. C. Slab Bridge
A three span, skewed, reinforced concrete slab bridge was field tested to destruction by the authors. Before the actual destructive test, nondestructive tests were performed to determine...
Aircraft Noise Monitoring at Denver International Airport
This paper describes design of the noise monitoring system for Denver International Airport. When the airport opens in 1993, the system must monitor compliance with two standards established...
Traffic Impact Assessment for Snow Disposal Facilities?Extended Abstract
Snow disposal facilities perform an integral role in the maintenance programs of many municipalities in canada and other northern countries. The most popular type of snow disposal facility...
Truck Loading Data for a Probabilistic Bridge Live Load Model
The University of Colorado at Boulder completed a major bridge testing and analysis program for the Federal Highway Administration (FHWA). According to FHWA, this study has produced the...
Live Load Models Based on WIM Data
The objective of the paper is to present the results of weigh-in-motion (WIM) measurements carried out in Michigan. Selected bridges were instrumented and truck weights and axle configurations...
Signing Systems: Directional, Identity, and Graphic Systems for the Port of Long Beach
The authors have developed (in conjunction with Port staff) a revolutionary roadside communication system for The Port of Long Beach. The system includes: Renamed piers for easier understanding...
Crane Raise with Zero Downtime
Massachusetts Fort Authority (MPA) was faced with a dilemma. Its Conley Terminal tenants needed higher cranes but could not relinquish the cranes for more than a few days at a time. No...
Beyond Engineering: The Politics of Maracaibo
The Lake Maracaibo Bridge in Venezuela was built in 1959. It ranks as one of the largest and longest bridges in the world at the time it was built and contained the longest concrete cable-stayed...
High-Capacity, High-Strength Trailer Designs for the GA-4/GA-9 Casks
General Atomics (GA) is developing final designs for two dedicated legal-weight trailers to transport the GA-4 and GA-9 Spent-Fuel Casks. The basic designs for these high-capacity, high-strength...
Return to search