Electrical Design of Small Hydro Plants
Major aspects of electrical design criteria for small hydro power plants used in co-generation schemes are: turbine control, generator and excitation equipment selection, protection relaying,...
Specification Writing for Small Hydro-Generators
For small hydro projects, it is all too common for the spec writer to use a convenient off-shelf spec usually written for a much larger unit. Minor modifications (primarily ratings) are...
Dynamic Analysis of Existing Tarbela Intake Towers
According to general practice at the time of the design, the pseudostatic method of applying earthquake loading was used. The basic acceleration was 0. 1g. A post-construction seismological...
Dam Safety Rehabilitation at Selected TVA Hydroelectric Projects
In response to President Carter's 1976 memorandum to all Federal agencies with responsibility for dams to develop and implement formal guidelines for dam safety, TVA restructured...
Dam Safety Relating to Merwin and Yale Hydroelectric Projects
This paper describes the safety investigations performed to evaluate the dams, associated with the Merwin and Yale Hydroelectric Projects, for the effects of severe floods and earthquakes....
Conversion Experience at the Chief Joseph Dam Project
In August, 1983, Woodward Governor Company was awarded U. S. Army Corps of Engineers contract DACW67-83-C-0076 to convert ten existing Allis-Chalmers and six existing Woodward Governor...
Carmen-Smith Uprate & Modernization
The Carmen-Smith Powerhouse is located on the upper McKenzie River, 75 miles northeast of Eugene, Oregon. Carmen's two nearly identical 42. 1 MVA vertical hydroelectric turbine...
Modernization of Existing Hydroelectric Power Stations in Conjunction with Conversion to Automatic Operation
The easiest and, in the long run, the least expensive method in most cases is the installation of an electronic turbine governor that is not only easy to incorporate in the power station...
Experiences During Overhaul of Hydroelectric Units
This paper describes some of the conditions found during major overhaul of main units at two hydroelectric power plants. Problems encountered and their solutions are described. The effects...
More Kilowatts with Less Investment
The paper discusses partial or complete modernization of hydraulic units and/or governing system as a means to increasing profitability. A combination of general and case history applications...
Analysis of Expanding the Wolf Creek Powerplant
The Nashville District, Corps of Engineers, is examining the feasibility of expanding the Wolf Creek powerplant to increase its peaking capability. The economic analysis of peaking expansions...
Application of Computer Aided Design and Analysis Tools for Upgrading Existing Power Plant Equipment
This paper presents examples where state-of-the-art computer aided design and analysis techniques have been applied to upgrade hydraulic performance and structural reliability of existing...
Practical Aspects of Repairing and Rewinding Hydro-Electric Generators
Often the general condition of the winding can be assessed and in some cases, corrective action can be taken to prolong the life of the winding. In other situations, the assessment may...
Performance Consideration for Selecting a Static Excitation System
Many hydropower plants today are being upgraded with new static exciter/regulator systems to replace the old existing rotary exciters. One type of system is the semi-inverting system where...
Infrastructure Development and Turbine Building
Aggressive development schedules which characterize many projects imply a degree of construction management know-how or alternatively, may say something about the state of the industry...
Renovation of the Shoshone Powerplant, Wyoming
Shoshone Powerplant and Buffalo Bill Dam are located on the Shoshone River approximately 5 miles (8. 1 km) west of Cody, Wyoming. The Powerplant was completed and the first two generating...
Synopsis: Ozark-Webbers Falls Turbine Repairs
The Ozark and Webbers Falls powerhouses were designed and constructed under the supervision of the U. S. Army Corps of Engineers and are located on the McClellan-Kerr Arkansas River Navigation...
Siphon Penstock?An Economic Way to Develop Hydros
As part of the 48 MW Jim Falls Hydro Redevelopment Project by Northern States Power Company, a minimum flow powerhouse was constructed with a siphon penstock. The Minimum Flow Unit (MFU)...
Competitive Model Testing for Replacement Runners at the Wells Hydroelectric Project
The Wells Hydroelectric Project, located on the Columbia River, contains ten Kaplan-type turbines. The plant has been in commercial operation since January, 1969. The runners have a long...
Application of an Integrated Numerical System for the Modernization of Hydro Turbines
The modules of an integrated numerical system for the new design and replacement of hydro power plant components are described and some examples of application are shown. The main modules...
Return to search