Taking the Loss Out of Risk
Since Superfund was authorized in 1981 and 22,000 hazardous waste sites put on notice, funds for remedial action have peaked with $20 billion annual clean-up budgets projected. But to...

Bright Lights Over China
The financing for Guangdong province's newest 700 mw coal fired electric power station came from a syndicate of 46 banks from 11 countries. The steel for the turbine generators...

Construction Guide Liners
Geomembrane liners for waste construction require meticulous construction, monitoring and weather watching. With much concern over the longevity of geosynthetics, many overlook the extreme...

Digestor Do-Over
Digesters at 6 Orange County (Calif.) wastewater treatment plants needed drastic odor control rehabilitation. Repairs included epoxy patching to cracked domes, installation of a geomembrane...

Dolores Pumped-Storage Unit?A Case Study in Planning
The Durango Projects Office of the U. S. Bureau of Reclamation (Reclamation) conducted a pumped-storage investigation from 1981 to 1983 on a site in southwestern Colorado. This paper describes...

Mt. Elbert Pumped-Storage Powerplant
This paper describes the principal design features, construction, and operation of Mt. Elbert Pumped-Storage Powerplant. Mt. Elbert is the Bureau of Reclamation's first and...

Unique Civil Engineering Features of the Balsam Meadow Pumped-Storage Project
The Balsam Meadow Pumped-Storage Project for the Southern California Edison Company is located in the Sierra Nevada Mountains approximately 55 miles northeast of Fresno, California. The...

The Bath County Pumped Storage Project
Virginia Power and the Allegheny Power System will introduce an important new peaking power service in late 1985, when the first unit of the Bath County Pumped Storage Station becomes...

Genesis of a Federal/Non-Federal Planning Study
This paper presents the course of action the Bureau of Reclamation undertook to develop an appropriate joint Federal/non-Federal planning process for a major pumped storage project. It...

Phased Pumped Storage Planning and Site Evaluation
A phase process of site evaluation provides for an efficient use of resources while supporting the necessary level of detailed investigation. This paper describes the phased siting process...

Hoover Dam Earthquakes Reconsidered
In 1936 and 1937 as the water rose behind Hoover Dam, earthquakes were felt in the Boulder City area and as far away as Las Vegas. Interest in induced seismicity was renewed in 1967 with...

Rehabilitation of a Pump/Turbine
Between 1964 and 1968, eight 212 in pump discharge diameter Baldwin-Lima-Hamilton vertical pump/turbines with Westinghouse motor/generators were installed in Philadelphia Electric Company's...

Design and Construction of Paute Project, Ecuador
The Paute Project is a key element in Ecuador's program for developing a modern electric power system. When fully developed, it will consist of three separate developments:...

Independent Review of Truman Dam Operation
The Truman Dam in Missouri was constructed by the Army Corps of Engineers in 1979 as a pumped-storage facility. Due to fishkill and other controversies, the pumpback feature of the project...

Performance Study of the Lagoon at Inuvik, N.W.T.
Since 1957, Inuvik's sewage has been discharged into a lagoon situated northwest of the townsite. In 1982 the lagoon was upgraded to a two-stage system. Two primary cells...

Evaluation of Sewage Treatment Requirements in Cold Regions: Case Study?City of Whitehorse
This paper describes a method available for evaluating sewage treatment requirements in cold regions. The City of Whitehorse wastewater management situation has been used as an example...

Developing a Community Water System for Shishmaref, Alaska
This paper discusses a unique water supply system for the City of Shishmaref, a moderately sized Alaska Native community on Sarichef Island in the Chukchi Sea. A three million gallon reservoir...

Frazil Ice Problems in Intakes at Montreal
Intakes located in reaches of the St. Lawrence River that stay open all winter can be subjected to frazil ice formation for nearly three months. The City of Montreal intake is a key example...

Geotechnical investigation: Cominco's Red Dog Mine Facilities
The siting of major facilities associated with development of the Red Dog Mine Complex in Northwestern Alaska on relatively warm permafrost soil and rock presented geotechnical engineers...

Permafrost: A Suitable Landfill Containment Barrier
Ice-rich permafrost is a suitable medium for the containment of wastes. The combination of frigid dry Arctic climate and the impermeability of ice-cemented permanently frozen ground can...

 

 

 

 

Return to search