Cold Regions Engineering
This volume contains papers that were presented at the 5th International Cold Regions Engineering Specialty Conference, sponsored by ASCE and held in St. Paul, Minnesota, February 6-8,...
Water Quality Monitoring of Highway Construction
The primary objective of water quality monitoring, as it relates to highway construction, is to obtain quantitative information to ensure that runoff from the construction site does not...
Design, Construction and Testing of Repairs to the Low Level Outlets at Terzaghi Dam
Operation of the low level outlets (LLOs) at Terzaghi Dam in southwestern British Columbia resulted in severe cavitation at operating heads significantly lower than design. Modifications...
Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...
Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...
Thermally Developed Blade Stresses and Cavitation Damage
Cavitation damage to the turbine runner blades, to the draft tube liner, and to the runner hub requires extensive welding repair. The traditional repair method is to gouge out the damaged...
Vibration Measurements in Condition Monitoring
Vibration measurements as condition monitoring helps discovering defects and wear at an early stage, and is used to plan repairs and maintenance according to plans for water consumption,...
Trashrack Cleaning?A Job Requiring Utmost Care
During the last few years, the tendency in most industries has been towards more automation. Hydro has been no exception. Trashrack raking machines have followed this trend, and automatic...
Upgrading Trashraking Equipment During Scheduled Maintenance Outages
Four small hydro plants in Northern California were selected by Pacific Gas and Electric Company to upgrade and automate their trashrack raking equipment during the 1988 maintenance outages....
Management System for Power Plants Tecaid Maintenance System
Operational conditions and production levels are maintained at consistently higher levels when a planned maintenance system is used. Initial operational expenses for a planned maintenance...
Challenging Site Conditions Lead to Unusual and Innovative Powerhouse Design Features
Pacific Gas & Electric Company's recently completed Newcastle Powerhouse is located on the shore of Folsom Lake near Auburn, California. The $26 million facility uses...
Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...
Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...
Cofferdams: An Integral Part of Small Hydro Design
Cofferdam construction costs can be a major factor in the viability of a small hydro development. For this reason, cost-effective design and construction are critical. A cost-effective...
Flashboard Alternatives Including Rubber Dams
This paper reviews some common flashboard methods used in the northeastern part of the U.S., and discusses the advantages and disadvantages of each type. The inflatable rubber dam is presented...
Hydraulic Features of Canyon Lake Hydropower Plant
The original hydraulic features of the Canyon Lake dam were well adapted to the addition of hydropower. Design, construction and anticipated operational details of the added hydropower...
Effects of the Environmental Approval Process on Project Scheduling and Economics
The environmental approval process is fundamental to the permitting of hydropower projects. Recent changes in permitting requirements has had a significant effect on the cost and schedule...
Newfoundland's First Arch Dam Construction Versus Climate
Paradise River arch dam is located in a narrow box canyon about 50 m deep and less than 10 m wide at streambed. It is a thin arch dam, especially sensitive to temperature loads, thus contraction...
Financing and Marketing Feasibility Tests for Proposed Federal Hydroelectric Power Projects
The Southwestern Power Administration (SWPA), an agency of the Department of Energy, is responsible for marketing the power and energy produced at Federal hydroelectric power projects...
New Martinsville Hydroelectric Project
The New Martinsville Hydroelectric Project consists of a dual bulb unit, 34 MW powerhouse constructed at an existing lock and dam navigation facility. The project was completed on budget...