Lessons from Schoharie Creek
The failure of the Schoharie Creek Bridge in New York State occurred in April 1987. Several investigative panels were commissioned. The failure has been generally attributed to scour,...

Cable Stayed Bridges
Two of these five papers on cable-stayed bridges deal with wind analysis. One develops the theory for motion due to flutter and reaches the conclusion that the vibrations are, in general,...

Analytical Studies of the Schoharie Bridge Failure
Analytical studies consisted of geomorphic, hydrologic, hydraulic, and erosion analyses including mathematical modeling with HEC-1 and WSPRO, the new FHWA water-surface profile model....

Schoharie Creek Bridge Model Study
On April 5, 1987, a major storm occurred in the Schoharie Creek watershed and the resulting flood caused the bridge to fail. The hydraulic model of the bridge was performed to simulate...

Estimation of Uplift Pressure in Cracks in Concrete Gravity Dams
This paper presents an analytical solution to predict uplift pressures in cracks in concrete gravity dams. It is shown that drainage systems are effective in reducing such pressures....

Hot Pressing of Lunar Soil and Qualification for Manned Applications
Lunar soil may be fabricated into useful building materials analogous to those used for masonry, concrete and ceramic pipe applications on earth. The process has been analyzed theoretically...

Cement-Based Materials for Planetary Facilities
The use of concrete and other materials based on a cementitious matrix is evaluated for the construction of planetary base facilities. Consideration is given to the most recent developments...

Concrete Lunar Base Investigation
Scientific and industrial operations on the moon require suitably shielded structures. Small structures for limited scientific activities may be constructed from structural elements prefabricated...

Lunar Cements/Concretes for Orbital Structures
The lunar surface is a rich source of inorganic building materials for large space structures. Lunar anorthosites can be processed into calcium aluminate cements in high temperature, high...

Concrete Production Method for Construction of Lunar Bases
If a permanent lunar base is to be built on the Moon, most of the materials for the construction would be made from in situ resources. From economic viewpoints, concrete would be the most...

Concrete Habitable Structure on the Moon
This paper presents construction methods for a concrete habitable structure on the Moon. The study was conducted on the assumption that a concrete manufacturing plant has already been...

Planetary Base Inflatable Form Construction
The use of the inflatable form (IF) structure has been practiced in the concrete industry for more than a decade. This article proposes the use of a double-walled IF for the Phase I construction...

Structural Art in the Lunar Environment
Building structures will be a necessary part of extending our presence on the moon. In designing and building these structures, aesthetic value will play a prominent role. History shows...

Composite Construction in Steel and Concrete
Composite steel-concrete systems are used extensively for buildings, bridges, and other civil engineering structures. Research and development related to composite construction are in...

A New Lake and a Beautiful Bridge
The two 1988 OCEA awards of merit are the Great Salt Lake west desert pumping project and the Sunshine Skyway near Tampa, FL. Both projects were constructed fairly quickly. The pumping...

Ten Top Projects for 1988
The other Outstanding Civil Engineering Achievement nominees make up an impressive collection of projects. They are notable for innovative management techniques, state-of-the-art engineering...

Seismic Damage and Retrofit of Bridges in California
Since 1971, the California Department of Transportation (CALTRANS) has retrofitted about 1300 bridges to improve their seismic resistance. CALTRANS has investigated 13 earthquakes since...

The Eccentric Entrance
Architects design irregularly shaped buildings to give their clients something different, and this creates problems for structural engineers, especially in earthquake zones. The Brinderson...

Tied Arch Substitute
When the Minnesota DOT decided to build a new bridge to replace St. Paul's historic High Bridge over the Mississippi, a citizen's advisory group insisted that...

Driving in the Fast Track
Fast track concrete allows traffic back on pavement within 24 hours. Fast track concrete has been developing in Iowa for the last three years. Traffic rerouting, an inconvenience that...

 

 

 

 

Return to search