Movement of Sediment Mixtures in a Parabolic Flume with Simulated Rainfall
A 4-m long flume with parabolic cross section and adjustable slope was constructed to investigate the sediment carrying capacity and the variation of grain size distribution during deposition....

Bed Topography and Sorting in Alluvial Channel Bends
A quasi-three-dimensional model has been developed for the purpose of calculating the velocity distribution, the bed topography and sediment sorting along channel bends. The depth-averaged...

Surface Roughness with Erosion of Earth Channels
A determination of the stresses effective in soil detachment is essential in determining erodibility. The soil roughness that exists during testing and in natural channels is a key element...

An Ongoing Investigation of Residual Suspended Material Transport in Central San Francisco Bay, CA
A study of suspended material transport in San Francisco Bay, California, is presently underway by the U.S. Army Corps of Engineers. This paper describes preliminary numerical model and...

Design and Construction of the Moose River Hydroelectric Project
The project's main features are: a 7 ft high, 240 ft long cast-in-place concrete overflow weir; bell mouth entrance concrete intake structure with trashrack and trashrake;...

Analysis and Rehabilitation of Ambursen Dams
This paper deals with the investigation and analysis of two Ambursen dams located in the upper Midwest. These investigations revealed that the original design contained significant defects,...

In-Situ Shear Strength Testing
Dam stabilization requirements at the Upper Mechanicville Hydroelectric Project on the Hudson River in New York were significantly modified based on the results of an in-situ direct shear...

Reduced O&M Costs through Better Metallurgy
There are many areas in hydroelectric power plants where better materials of construction can reduce operation and maintenance (O&M) costs. Some of the most nagging problems deal...

Analyses of the Lower San Fernando Dam Failure
The main methods employed for the back analysis of the behaviour of the Lower San Fernando Dam during the 1971 earthquake are described. The requirements for a comprehensive analysis are...

Domed Renovations
Inside the granddaddy of domed stadiums, the Houston Astrodome, 10,000 new seats and 72 new suites were hung from a strengthened structure. Using a variety of working-with-what-we've-got...

Asphalt-Rubber Concrete?A New Horizon
The performance of asphalt concrete pavements is dependent to a large degree upon the rheological properties of the asphalt binder. Asphalt-rubber as a binder material extends the temperature...

Hot Mix Asphalt Utilization in Railway Trackbeds
Described herein are the rationales for, descriptions of and evaluations of hot-mix asphalt (HMA) trackbed rehabilitation and construction techniques recently utilized in various classes...

Liability Traps to Avoid
This presentation shows several problem situations and the rules of the game as played by the industry and the courts. It makes three basic assumptions. One, the Materials Engineer knows...

Box Segmentals: Refining Design
Officials at the Florida Department of Transportation (FDOT), which has built more precast concrete segmental box girder bridges than any other state, say their troubles with that design...

High-Strength Concrete: Weighing the Benefits
Russell, Gebler and Whiting describe the properties of high-strength concretes, the current state of knowledge on freeze/thaw effects, and procedures for batching, mixing, transporting,...

Creative Application of Materials Engineering
Society's demand for an aesthetically pleasing and safe constructed environment, along with the construction industry's higher and higher costs, dictate that...

Affordable Housing and the Civil Engineer
The Joint Venture for Affordable Housing (JVAH) Demonstration. Program accomplished the goal and reduced the first time cost of housing by up to 30% through the use of innovative methods...

Specification as a Requirement for Hot Mix Asphalt
A brief description of the current national research programs that affect the development of specifications is included in this paper. Elements of the Strategic Highway Research Program...

Specifications and Constructibility
The article discusses these and other aspects of the subject, including training programs for inspectors and project managers, research/development and pilot testing of new products, methods...

Tunnel Maintenance Operations
Maintenance considerations during both the design and operational phases are very important to good tunnel maintenance. The use of proper materials able to withstand the rigorous environment...

 

 

 

 

Return to search