An Integrated Project Control Model
This paper defines the scope of current project control activities and presents an overview of the tools used to control projects. Problems with current project control systems and the...

Integrating Voice Recognition Systems with the Collection of Project Control Data
The Construction Industry in the 1990's will be dominated by emphasis on Productivity, Competitiveness and Innovation. Success or failure in these areas lies in one word, Technology, and...

Project Control Via Acoustical Sensing
This paper describes ongoing research into automating the process of collecting project control information using acoustical sensing devices. The paper describes how frequency spectra...

The WMATA Resident Engineer and the METRO Construction Team
This paper discusses the organization, mission and functions of the Resident Engineer and the other construction elements of the Washington Metropolitan Area Transit Authority (WMATA)....

Variables Impacting Design Effectiveness Key to Project Quality
This paper reports on two-year research at Worcester Polytechnic Institute, which was supported by the Construction Research Institute (CII). Over forty (40) input variables to design...

Evaluation of Design Effectiveness
Design is basically a subjective process, limited by rules of mechanics and physics but oriented toward optimizing certain features determined by a client and reflected in the stated criteria...

Specifications for Masonry Structures
Specifications for Masonry Structure (AC1530.1-88/ASCE6-88) is a joint effort of the American Concrete Institute and the American Society of...

Enhancement of Walleye Spawning Habitat Through Flow Regulation
This paper present the results of a study focused on assessing the flow requirements for walleye spawning below a hydroelectric project. The results suggested that both the fishery resource...

An Approach to Addressing Interactive Effects of Multiple Hydro Projects in a River Basin
Cumulative effects issues continue to arise, not only related to multiple small hydro projects, but also to multiple relicensing of major projects, development of multiple projects at...

Cumulative Impact Assessment: Issues to Consider in Selecting a Cumulative Assessment Method
Because widespread interest in the subject is new, there are no standard or generally recognized methods for cumulative impact assessment. A method should include procedures for (1) evaluating...

Cumulative Impact Assessment: Application of a Methodology
The authors expanded upon the Federal Energy Regulatory Commission's (FERC) Cluster Impact Assessment Procedure (CIAP) to provide a practical methodology for assessing potential...

Instream Flow Methodologies and Requirements
Instream flow is a term applied to the discharge occurring downstream from and at least partly controlled by a dam or diversion structure. The volume and timing of instream flows most...

Reservoir Regulation in the Monsoon Climate of Korea
An examination of reservoir regulation rules in light of uncertain estimates of river flow in the Han River Basin, Republic of Korea, shows that two strategies will improve total hydroelectric...

Optimal Operation of the Savannah River System
This paper presents an application of a stochastic control method to the real time operation of the Savannah river system which includes three reservoirs and is expected to meet energy...

The Use of Time Series Analysis to Estimate Flow Duration Curves to Assess Energy Potential for Low Head Hydro Redevelopment
The proposed hydroelectric site location has a low head potential making discharge the primary energy production component. A flow duration curve (FDC) study was commenced to generate...

New Martinsville Hydroelectric Project
The 34MW New Martinsville Hydroelectric Project is presently under construction in West Virginia. Located at Hannibal Locks and Dam near river mile 126 downstream from Pittsburgh, PA,...

Osoyoos Lake Control Structure
The new Osoyoos Lake Control Structure has been built on the Okanogan River at Oroville, Wa. The site is about 2 miles downstream from the outlet of Osoyoos Lake, and about 9 miles south...

A Mathematical Model for Traveling Screens at Hydropower Plants
Hydroelectric projects cause significant mortality to fish migrating downstream. The current method to reduce fish mortality at hydropower plants is the use of traveling screens. In this...

The Impact of Inlet Flow Characteristics on Low Head Hydro Projects
This paper discusses the intake civil designs, addressing head loss and flow distribution into the turbine intake. The impact of poor flow quality on head losses, turbine performance,...

Analysis of Hydraulic Transients for Design and Operation of Two Powerhouses in Series
The Dinkey Creek Project will be located in the southern Sierra Nevada mountains 40 miles north-east of Fresno, California, and will develop about 4000 ft of gross head with a maximum...

 

 

 

 