Port Layout Optimization for Large Bulk Carriers in a Strong Tidal Currents Site
To provide the sheltering conditions of Ponta da Madeira Terminal (TPM) in Sao Marcos Bay, in Sao Luis, Brasil, two rubble mound groins were designed and constructed according to hydraulic...

Pre-Storm and Post-Storm Hurricane Planning in Nags Head, North Carolina
Located on a barrier island on the Outer Banks of North Carolina, the Town of Nags Head is vulnerable to the direct effects of hurricanes and extra-tropical storms. The Outer Banks, as...

Flood Insurance Construction Standards: Can They Work on the Coast?
This article discusses the construction standards employed for flood insurance. Flooding caused by Hurricane Fredric is employed as a case study....

Effect of Wind on Coastal Construction in Florida
The State of Florida's tidal shoreline is 8,426 miles long. Both the east and the west coast of Florida is subjected to several coastal storms each year. The present study...

Foundations and Breakaway Walls of Small Coastal Buildings in Hurricane Hugo
After Hurricane Hugo a survey of damage to small, coastal buildings was conducted in North and South Carolina. The performance of elevated foundations, breakaway walls and foundation cross...

A Conflict Avoidance Methodology for Port Dredging Issues
Port dredging operations have often been the focus of controversy over environmental and funding disputes. This paper asserts that adversarial relationships among interested parties will...

Phased Engineering Development and Multiple Agency Review of Public Safety Issues
Several Santa Barbara County agencies have key engineering review responsibilities for new development. The magnitude of issues raised and the level of engineering review required for...

Physical Modelling of Pocket Beaches
The design of artificial beach systems is dependent upon the modelling criteria and on the selection of the sand material to be used for nourishment. In order to obtain a stable beach...

The Use of Hydraulic and Mathematical Models for Designing a Small Artificial Beach
This paper presents a case study in which physical and mathematical models are used for determining the behavior of a small artificial beach under wave attack. The beach is protected by...

The Challenge of Meeting New Effluent Guidelines
Meeting new effluent guidelines is presenting a challenge to the environmental engineer. In most cases, existing plants must be retrofitted which will involve options of source treatment,...

Environmentally Sustainable Development: A Concept in Action
Environmentally sustainable development denotes a balanced approach with appropriate consideration for environmental protection. The successes achieved in the development of five diverse...

Constructed Wetlands at Mesquite, Nevada
Subsurface flow (SF) wetlands are used to provide effluent polishing following treatment in an aerated lagoon at Mesquite, Nevada. General SF wetland design methodology is discussed in...

Reliability-Based Estimates of Wetland Detention Times for Wastewater Treatment
Determination of the hydraulic residence or detention time is often the first step in design of wetlands constructed for wastewater treatment. Current methods for estimating wetland detention...

Inventory of Constructed Wetlands for Municipal Wastewater Treatment in the U.S.
The U.S. EPA's Risk Reduction Engineering Laboratory is conducting an inventory of constructed wetlands (CW) for municipal wastewater treatment in the U.S. The inventory is...

Electronic Computation
This proceedings, Electronic Computation, consists of 46 manuscripts presented at the Tenth Conference on Electronic Computation held parallel...

Approximate Methods and Verification Procedures of Structural Analysis and Design
This proceedings, Approximate Methods and Verification Procedures of Structural Analysis and Design, contains selected papers presented at...

Project Peer Review Guidelines
Project Peer Review Guidelines, a joint effort of the American Consulting Engineers Council (ACEC) and the American Society of Civil Engineers...

Connecting With DOTs
Want to bid on projects from state departments of transportation? First make sure your firm can translate computer-assisted drafting (CAD) drawings into different computer file formats....

Unit Pricing and Unbalanced Bids
Unit price contracts were meant to provide a simple and equitable way to pay contractors. However, to offset the uncertainties inherent in construction, contractors unbalance bid items....

Breaking Down the Barriers
The structural engineering of multistory buildings is a complex and time-consuming chore, but new design and analysis tools can greatly simplify the task. The article traces the development...

 

 

 

 

Return to search