Underwater Tunnel Inspection by Virginia Power Using a Submersible Robot
The Bath County Pumped Storage Station, has three large tunnels linking the upper and lower reservoirs. The 'Hydrover' submersible remotely operated vehicle (ROV)...
Southwest Pass Training Structure Alternatives
The U.S. Army Engineer Waterways Experiment Station system of computer programs, TABS-2, was utilized to evaluate various structural plans for increasing channel velocities and sediment...
Glacial Basin Flow for a Power Operation Model
A power operation model was developed and used to estimate the project energy generation and reservoir level fluctuations. In order to precisely simulate the daily project operation, daily...
Localized Mixing for Improvement of Hydropower Releases from J. Percy Priest Reservoir
The J. Percy Priest Project, located on the Stones River near Nashville, TN, experienced low dissolved oxygen (DO) in the tailwaters during hydropower generation. Using commercially available...
Debris Torrents in Nepal and Use of Reliability Engineering Concepts During Redesign of River Works
Debris torrents, generated by cloudbursts and by glacier lake outbursts, occur frequently in the Nepal Himalaya. A simple fault tree analysis is applied to the destruction of a diversion...
Model for Determining the Optimal Rehabilitation and Replacement of Water Distribution System Pipes
K.E. Lansey and L.W. Mays developed a new methodology for the minimum cost design of new and expansion of existing water distribution systems. This methodology interfaces a nonlinear programming...
The Hydro Business: 1990 and Beyond
During the last ten years, hydroelectric generation received more and more attention as a source of reliable and economical electricity. Since the first WATERPOWER conference, the industry...
Status of Hydropower Development at Corps of Engineers Dams
The Corps of Engineers is the largest single supplier of hydroelectric power in the United States with 74 projects and an installed capacity of 20,839 MW. In addition, 33 Corps projects...
The Development and Writing of the ASCE/EPRI Hydroelectric Guidelines
In the Spring of 1989, the American Society of Civil Engineers (ASCE) and the Electric Power Research Institute (EPRI) jointly published their Civil Engineering Guidelines for Planning...
Project Evaluation?Don't Miss the Boat
The hydroelectric developer is faced with many decisions during the evaluation stage. These include determining the size of the project, financial analysis to be used, type and number...
Hydropower Development under the Utility Concept of Least Cost Utility Planning
The impetus behind 'Least Cost Utility Planning' (LCUP) is that if new generation or purchased power could be deferred, the resultant savings could be used to...
Determining Hydro Project Dependable Capacity
Traditional techniques for estimating a hydro project's dependable capacity are of limited value when evaluating a hydro project in a thermal-based power system. For such...
Important Aspects of Annual Energy Calculation Techniques for Low Head Hydro Power Plants
Annual energy calculations are frequently used to optimize design parameters at a turbine site and to compare energy production based on equipment offers from various suppliers. In this...
Quantifying Uncertainty in Hydropower Planning
Power system operators must deal with various types of uncertainties. Some are related to inputs, such as system load and water supply, while others pertain to the system itself, such...
Joint Economic Evaluation of Pumped Storage in Colorado
This paper summarizes a joint planning study completed in December 1988 on the economic potential of pumped-storage development. The study was unusual in water development investigations...
An Investigation of a Pumped Storage Hydropower System
In order to provide a realistic basis of determining the viability of a wind-powered hydroelectric system at a potential site, an evaluation technique has been developed. Basically, this...
Devil Canyon Second Afterbay
This project is located in the City of San Bernardino (Southern California). The addition of a second afterbay for the Devil Canyon Powerplant has been in the planning stages since October,...
Case Study Incremental Approach to Cost Analysis for Improvements to Wise Powerhouse Penstock
In 1980, Pacific Gas and Electric Company (PG&E) began studying the addition of a second powerhouse to the existing Wise Hydroelectric Project. Because of the existing project...
Storage Reallocation in Hydropower Projects of North Georgia
Over the past 40 years, the Corps of Engineers has built nine multiple purpose storage projects in Georgia, with hydroelectric power production as a major purpose. Six of the projects...
Economic Trade-Off between Hydropower and Other Competing Water Uses: A Case of Coteau Creek Station
Using the Coteau Creek hydropower generating station in Saskatchewan as a case study, economic trade-offs between water used for hydropower generation, and irrigation and recreational...
Return to search