Sources of Urban Pollutants?Do we Know Enough?
The non-USGS data from the NURP program are summarized in terms of their availability and adequacy for decision making and modeling. Results of selected projects are reviewed and related...

Runoff Controls in Wisconsin's Priority Watersheds
The Wisconsin nonpoint source program is becoming more heavily involved in urban runoff controls. About 3 million of state cost sharing money has already been allocated to controlling...

Case Studies of Need-Based Quality-Quantity Control Projects
This paper briefly describes several nonpoint source (NPS) pollution control projects motivated largely by local need, not by government regulatory and funding programs. The case studies...

A Profession Peers at Itself
An increasing number of firms are inviting their competitors to come in and survey the way they do business. Peer reviews cover all aspects of a firm's management, from record...

Earthmoving and Heavy Equipment
These proceedings are comprised of technical papers, reports, remarks, and discussions presented at the Specialty Conference on Earthmoving and Heavy Equipment in Tempe, Arizona, on February...

Quality of Inspectors?In Search of Excellence
Assuring quality in construction has become a major challenge to the design/construction industry today. Attention to the issue has been a result of problems in the nuclear power industry...

Waterfront Planning and Development
These papers were presented at the Waterfront Planning and Development Symposium held in October, 1986 during the Boston ASCE Convention. The Symposium presented an all inclusive picture...

Management Lessons from Engineering Failures
Engineering failures are not always catastrophic. More are due to improper management of contracts rather than actual physical failures. Some result in loss of life; most result in disputes...

James B. Francis and the Northern Canal
Lowell became America's first great industrial city because of the power of the Pawtucket Falls and the efforts of an amazing group of engineers, industrialists, and workers....

CPM Harnesses Mammoth Powerplant Job
One of the largest air quality control retrofit projects in the U. S. is at the Sammis Plant of Ohio Edison Co., along the Ohio River 40 miles west of Pittsburgh. The coal-fired plant's...

Design Flexibility Cuts Costs
The Los Angeles Water Department saved $5 million on a pipeline project by investigating the capabilities of pipe fabricators to furnish the pipe size required and by being open to alternate...

Infrastructure: Rehabilitation or New
Basically, each public entity needs to inventory its infrastructure system and evaluate its importance to the immediate requirements of public health, safety and welfare. Prioritize the...

Infrastructure Project Management and the Power of Implementation
The purpose of this paper is to bring renewed attention to project management concepts and public policy implementation issues as they apply to infrastructure development and renewal....

Financing the Golden Gate Bridge?Past and Present
This paper discusses the financial side of the project, which was a very innovative solution that provided federal revenue not only for the Bridge Redecking Project, but more importantly...

Quality Control: A Neglected Factor
Quality in construction is too important to leave to chance. A project quality control plan would begin by incorporating testing and inspecting requirements into the specifications. Engineers...

How Do Engineers Learn to Manage?
Most engineers prefer design problems to management problems, but if a firm is to prosper, project managers must learn to manage and devote time to management. Earth Technology Corporation...

The Pursuit of Quality: QA/QC
Quality assurance and quality control programs are mandated for many federally-funded construction projects. The private sector is also increasingly requiring such programs. The terms...

Design of Strontia Springs Arch Dam
The development of the layout and the history of design of the 292 foot (89 m) high Strontia Springs Dam is presented. While a brief description of the general project layout and foundation...

Pipeline Hardware: Special Designs for Arctic Projects
The hardware used to support and protect arctic pipelines has evolved through several years of innovative design work by various engineering firms. The hardware used on the Kuparuk River...

Validation of the CICE Code for Ice Ride-Up and Ice Ridge Cone Interaction
The discrete element method is capable of analyzing multiple, interacting, deformable, discontinuous or fractured bodies undergoing large motions and rotations. The formulation solves...

 

 

 

 

Return to search