Refuse Recycling
The refuse recycling plant at Columbus, Ohio, is a pioneer in burning as fuel a combination of refuse and coal. This hybrid fuel has advantages over burning either alone. One winter in...
Flood Control
The Hamilton and Riemer reservoirs were constructed by excavating pits below grade to receive flood overflows from adjacent streams. The two reservoirs are part of a 52 sq. mile (135 km�)...
River Meandering
The erosion and sedimentation processes associated with river meandering have a profound effect on man's use of rivers and their valleys, as well as the natural environment....
Thalweg Disposal: Demonstration of an Alternative
Disposal of dredged material in the main channel, or thalweg, is an alternative disposal option for maintenance dredging. The material dredged from the Upper Mississippi River is clean...
Open Water Disposal for Marsh Creation James River, VA
There is a need for close cooperation between design and construction of levees on soft foundation for containing dredge material. The scope of this study included marine exploration,...
Environmental Considerations of Thalweg Disposal
Disposal of dredged material in the thalweg or deepest portion of the Upper Mississippi River is one of several disposal alternatives that can be utilized. Aside from the mechanical/cost...
Impacts of an Overboard Disposal Operation
The objective of this study was to establish an acceptable dredge disposal site which would be physically and environmentally suitable for periodic use over the 50-year project life of...
Mississippi River Fairview Crossing Test
To improve estimates of shoaling rates in the crossings of a deep draft channel from New Orleans to Baton Rouge, a prototype test was conducted in Fairview Crossing at Mile 116 above Head...
Deep River Study - Lower Mississippi River
The current local/federal stalemate over project funding for major dredging projects has deterred U. S. ports in benefiting from the economies inherent in the use of deep-draft ships....
Marsh Creation Impacts - Mississippi River Delta
Significant conversion of marsh to open water is occurring in the Mississippi River Delta. Evidence is presented that marsh is more valuable to fish and wildlife resources than open water;...
Toxic Contaminant Uptake in Dredged Sediment Marshes
Dredged sediments from the proposed enlargement of the Lower Mississippi River from Venice, Louisiana to the Gulf of Mexico would be primarily utilized to create up to 28,000 hectares...
Ten Years of Long-Term Dredged Material Disposal Planning in the St. Paul District
Long-term dredged material disposal planning for the Upper Mississippi River by the St. Paul District had its beginnings with the Great River Environmental Action Team study (1975-80)....
Dredged Material for Backbarrier Salt Marshes
Gulf Coast barrier islands, especially those fronting the Mississippi River Delta, are eroding at a rapid rate. Natural subsidence caused by consolidation of Recent deltaic deposits and...
The Experience of the St. Paul District Corps of Engineers, with State Coordination of Dredging Activities
The St. Paul District annually dredges about 1 million cubic yards of predominately clean sandy river sediments. Most of this volume comes from our maintenance of 284 miles of the 9-foot...
Influence of Roughness on Velocity and Dispersion at Low Flow
Dependence of the hydraulic and transport characteristics of low flow on channel roughness is investigated. Empirical expressions are used to estimate roughness coefficient as a function...
Steady-Site Dispersion of Pollutants in Rivers Near Sewage or Drainage Outfalls
A theoretical model is developed for determination of concentration distribution of pollutants in a river. Pollution is caused by the disposal followed by dispersion of sewage or drainage...
Effects of Fines in Gravel Bed Streams Behavior
A model-gravel bed stream is studied in the laboratory. Flow visualization of bedload motion correlates with bursting phenomena near the bed. The bedload variation as a result of the addition...
Numerical Model of Mississippi River at Lock and Dam 26
Replacement work was initiated in November 1979. The first stage cofferdam constricted about half of the river channel. As a result, the flow velocity at the constriction increased causing...
Incipient Resuspension of Silt-Clay Sediment
The laboratory study of incipient motion of fine-grained cohesive sediment under oscillatory flow, unidirectional flow and the combined effects of oscillatory and unidirectional flow is...
Development of Response Plans for Toxic Spills
A plan is proposed for managing the response to a toxic spill into a river system and the minimization of its effects on water utilities, industry and the environment. As technical aids...