CAD Speeds Viaduct Replacement
Lack of an available detour around construction of a major viaduct spurred city officials in Reno, Nev. to build a bridge nearby to serve the purpose. Although funded separately, the permanent...

Glitches in Flitch Beam Design
Wiesenfeld proposes a set of design criteria for flitch beams. These beams, in which wood and steel sections are bolted together to act as a single structural unit, are currently covered...

Storing Sediment and Freeing Fish
When Mount St. Helens erupted in May 1980, it sent a river of pyroclastic ash and other debris into Washington's North Fork Toutle River Valley. The resulting debris pile...

Liability Traps to Avoid
This presentation shows several problem situations and the rules of the game as played by the industry and the courts. It makes three basic assumptions. One, the Materials Engineer knows...

Waterpower '89
The 1980's have been characterized as an era of uncertainty for world energy including future demand for energy, fuel prices and availability, regulatory constraints, environmental...

Civil Engineering Guidelines for Planning and Designing Hydroelectric Developments
Civil Engineering Guidelines for Planning and Designing Hydroelectric Developments was prepared under the auspices of the Hydropower Committee...

Avoiding and Resolving Disputes in Underground Construction
Successful Practices and Guidelines
A method of developing cooperative, problem-solving attitudes on projects through a basic risk sharing philosophy between owner and contractor is presented. Special contracting provisions...

Segmental Tunnel Lining Meets `Buy American'
Segmental concrete tunnel lining is the other innovation proven during construction of the Washington Metropolitan Area Transit Authority (`wmata'). Although `wmata's'...

Post-Tensioned Transportation
Post-tensioned highways are relatively new. U.S. 220 near Altoona, Pa. has the first major installation in the country. There two miles of pavement are continuous concrete panels, each...

Seismic Codes:Preparing for the Unknown
Few eastern communities follow seismic codes because few communities view earthquakes as a risk. Although California-sized quakes have hit Charleston, St. Louis, they've done...

Screaming Structures
As any designer of roller coasters will tell you, civil engineering principles put the thrills and screams into roller coasters. There are two basic differences between roller coaster...

Creative Application of Materials Engineering
Society's demand for an aesthetically pleasing and safe constructed environment, along with the construction industry's higher and higher costs, dictate that...

Affordable Housing and the Civil Engineer
The Joint Venture for Affordable Housing (JVAH) Demonstration. Program accomplished the goal and reduced the first time cost of housing by up to 30% through the use of innovative methods...

Contractability?Recent Concepts in Contracting
Owners are customizing project delivery systems by uniquely aligning service agreements and construction contracts. Seeking more productive ways to construct facilities, owners currently...

A Model Cost Comparison Between Construction Management and General Contracting
This paper presents a model cost comparison between general contracting and construction management in a typical mid-rise 5-10 story office building. The model separates cost of construction...

Building Commissioning
In order to detect and correct defects in a timely, cost effective manner, HVAC system commissioning has recently been used as part of building construction. Preliminary evidence suggests...

Metro Project Implementation?The Early Stages
Metro (the Municipality of Metropolitan Seattle) is a federation of governments in King County, Washington which is responsible for regional public transportation and waste water collection...

Getting the Most From Engineering Consultant
The Los Angeles County Transportation Commission ('LACTC') has embarked upon a 150 mile rail transit construction program within Los Angeles County. A program...

Selection of Consultants for Municipal Water/Wastewater Projects
The City of Dallas, Texas Water Utilities Department is responsible for the design and construction of all needed water and wastewater facilities including treatment plants, pump stations,...

Highway Project Constructability
Results from on-going research into highway project constructibility are discussed. Research objectives and methods are outlined. Prime constructibility objectives are presented along...

 

 

 

 

Return to search