Replacement of a Deteriorated Steel Sheet Pile Bulkhead
This paper presents a life history of a marine steel sheet pile bulkhead, over 35 years old, that has been exposed to a salt water environment with minimal maintenance or repair in the...

Historic Seawalls of the Boston Harbor, Massachusetts Region: Evolution, Construction and Repair
The earliest seawalls in the Boston region were of crib construction. Cobb cribs had an open framework and could readily be floated into position and sunk with rock from local sources....

Draft Chapter 2?Planning and Design Guidelines for Small Craft Harbors?Entrance Design and Breakwaters
The paper will present a very preliminary draft of the second chapter of an ASCE manual that is currently being developed. The new manual is entitled Planning and Design Guidelines for...

An Overview: Wetland Restoration, Protection, and Establishment by Beneficially Using Dredged Material
Dredged material has been used beneficially by mankind for many years; in the past two decades it has purposely been used to restore and protect existing wetlands, and to establish new...

Computer Support for Water Quality Management in San Diego Bay
At present, a variety of computer based systems and techniques, including mathematical models, data bases, information management schemes, statistical analysis packages, and graphical...

Extended Experience with a Short-Term Hydropower Scheduling Model in New England
The New England Power Exchange (NEPEX) is responsible for the central dispatch of power throughout New England. To assure the maximum benefits of power pooling, the electric facilities...

Engineering Aspects of Wetland Design
Successful wetland enhancement, restoration, or creation projects require integration of desired wetland functions, local hydrologic and soil conditions, and biological requirements into...

Highway Construction and a Trout Stream Relocation
In 1970, a ten-mile section of Traffic Route 15 in the northern portion of Lycoming County extending into Tioga County was under design as a two-lane limited access highway on four lane...

Assessing the Reliability of the Water Supply to a Closed Basin Wetlands
In many reports, it has been predicted that the loss of the Cheyenne Bottoms as a wetlands area would have an adverse effect on a great deal of the North American migratory shore bird...

Development of a Phase I Prescriptive Reservoir Model
The U.S. Army Corps of Engineers Hydrologic Engineering Center (HEC) has recently developed a Phase I generalized prescriptive reservoir model referred to as HEC-PRM. The purpose of the...

Proposed Development of South Central Florida Hydrologic Ecosystem Model
The Corps of Engineers has been authorized to develop and operate a simulation model of the hydrologic ecosystem of central and south Florida. This ecosystem is fragile and complex, and...

Delaware Estuary Nonpoint Source Control Program
Preparation of the Delaware Estuary Management Plan, sponsored by the EPA and the three states of New Jersey, Pennsylvania and Delaware, is part of the national estuaries program. As part...

Computing in Civil Engineering and Geographic Information Systems Symposium
This proceedings consists of the papers presented at the Eighth National Conference on Computing in Civil Engineering and Geographic Information Symposium, held in conjunction with A/E/C...

Engineering, Construction, and Operations in Space III
This proceedings, Engineering, Construction and Operations in Space III, consists of over 200 papers presented at Space '92, the...

Engineering Mechanics
This proceedings, Engineering Mechanics?Ninth Conference, consists of the texts of the three keynote lectures and brief summaries of submitted...

Investigation of a Concrete Blistering Failure
During construction of a concrete pavement at a military airfield, numerous small blisters formed on the concrete surface behind the slipform paver and were filled by the contractor using...

Standard Methodologies for the Forensic Investigation of Pavements
The high costs of new construction have made the preservation and restoration of existing pavements an attractive alternative to replacement structures. Existing pavements that are to...

An Airfield Pavement Forensic Analysis: Cairo East Air Base
The US Army Engineer Waterways Experiment Station (WES) was requested by the Middle East/Africa Projects Office in April 1989 to provide technical assistance in analyzing an unstable asphalt...

Forensic Analysis of a Two-Component Joint Sealant Using FTIR-ATR
Fourier-Transform Infrared Spectroscopy using Attenuated Total Internal Reflectance (FTIR-ATR) was used to chemically identify joint sealants obtained from an airfield pavement joint which...

Procedures for Evaluating Aggregate Gradation Specifications
The construction and rehabilitation of transportation facilities annually consumes huge quantities of aggregates. And, the variability in supply and demand for these materials as well...

 

 

 

 