Modeling of Saturated Zone at Yucca Mountain, Nevada
This paper presents preliminary results of groundwater modeling of the saturated zone in the vicinity of Yucca Mountain. The analysis used both a regional (approximately 250 ? 250 km)...
Borehole Security on the Yucca Mountain Project
A borehole security plan was developed and is being implemented to address safety, environmental protection and restoration, waste isolation, and security concerns related to boreholes...
Robust-Multibarrier Waste Package Thermal Evaluation
One of the key issues to be addressed in developing a successful permanent radioactive waste storage concept is the thermal effect due to the spent nuclear fuel (SNF). The thermal output...
A DAD Example: The Story of the Fourth Nuclear Power Plant in Taiwan
Over the past decade, nuclear power play an important role in help develop Taiwan's internationally recognized economy. The effort for putting the new nuclear power plant onto the grid...
Strontium Isotopic Evidence for a Higher Water Table at Yucca Mountain
At Yucca Mountain, calcite occurs as open-space fillings and coatings on fractures within much of the host volcanic rocks in both the saturated and unsaturated zones. Strontium isotope...
Project on Contaminations-Radiation-Ecosystems-Health in Russia
We would like to discuss with you a project that we are currently developing, doing research upon and completing. In our report we represent the the following: - a few experimental data...
Small-Scale Behavior of Single Gravity-Driven Fingers in an Initially Dry Fracture
Experiments investigating the behavior of individual, gravity-driven fingers in an initially dry, rough-walled analog fracture are presented. Fingers were initiated from constant flow...
Flow Visualization and Relative Permeability Measurements in Rough-Walled Fractures
Two-phase (gas-liquid) flow experiments were done in a natural rock fracture and transparent replicas of natural fractures. Liquid was injected at constant volume flow rate, and gas was...
Basin Scale Management of Surface and Ground Water
An important element in the economic development of many regions of the Great Plains is the availability of reliable water supply. The primary supply has tended towards developing groundwater...
Fresno/Clovis Water Management Plan
The Fresno/Clovis Metropolitan Area (FCMA) in California has historically relied solely on untreated, undisinfected groundwater as a source of potable water to serve 500,000 people. Contamination...
Urban Water Planning?A Western Nevada Case Study
The result of the increased demands due to population growth in the Reno/Sparks urban area and new uses i.e., environmental and Pyramid Lake related, has created increased competition...
Water Management Plan for Lake Okeechobee
Lake Okeechobee is a large, natural freshwater lake in Southern Florida with a drainage area of about 5,650 square miles. The Corps of Engineers operates and maintains project works on...
A Computer Model for Multiplant Hydroelectric System Simulation
An interactive computer model of a multi-plant hydrothermal electric power generating system has been developed that roughly captures the main features of the British Columbia Hydro system....
Licensing and Permitting the Devil's Nose Project Under the 1990's Regulatory Conditions
Amador County is one of California's mountain counties of the western slope of the Sierra Nevada range in the north central portion of the state. The present population is estimated to...
Partnering in Water Resources Planning in Florida
This paper discusses successful partnering efforts by the Corps of Engineers in water resources development in Florida. The partnering involves the Corps, local project sponsors and other...
Public Process in Fresno/Clovis Water Supply Plan
Groundwater is the principal reservoir for the Fresno/Clovis Metropolitan Area (FCMA) of Central California. However, significant portions of the aquifer are threatened by pesticides and...
Evaluating Environmental Projects
Throughout the Nation, there is increased awareness of and concern for, environmental protection and restoration. Within the U.S. Army Corps of Engineers, new authorities are providing...
Operating the Columbia River: A Balancing Act
Agreements to market the Canadian share of the hydroelectric power generated at U.S. facilities as a result of the Columbia River Treaty will begin terminating in 1998. Renewal of the...
Glen Canyon: The Economic Costs
Revenues from power produced at Glen Canyon Dam are used to support Colorado River Storage Project (CRSP) purposes, to pay O&M costs, and to repay construction costs. Generation...
The Economic Value of Trout Fishery Management Programs
The contingent valuation method is used to estimate the economic value of a trout fishing day at the Cache la Poudre River in Colorado. In addition, changes in daily economic value and...
Return to search