Demonstration Project for Scour Instrumentation
A Federal Highway Administration (FHWA) Demonstration Project was developed to facilitate technology transfer of instrumentation related research to the highway industry. The objective...
Velocity Measurements by the One-Orange Method
Application of the most sophisticated instrumentation - so called state-of-the-art equipment - is not always necessary nor even desirable for measurement of mean velocities in verticals,...
Experimental Study on Unsteady Flow in Open Channels with Flood Plains
Hydraulic characteristics of unsteady flows were investigated experimentally in open channels with flood plains using a computer-controlled water supply system. Some noticeable features...
Instrumentation Needs and Possibilities: A Dialogue Between Suppliers and Users
The present symposium includes a panel discussion to address and illuminate needs and possibilities in hydraulic instrumentation. The panel discussion is organized with the intent of promoting...
Bridge Scour Instrumentation
This paper presents a brief status report of research funded by the National Cooperative Highway Research Program (NCHRP Project 21-3, Instrumentation for Measuring Scour at Bridge Piers...
Reservoir Operation by the Use of an Expert System
Most reservoirs, designed for the purpose of flood control, face operational problems during periods of drought. This study uses five indicators, streamflow, precipitation, temperature,...
Scada System Requirements for Optimum Pumping
In order to minimize the cost of electric energy for pumping water through its distribution system, a computer program was developed to schedule the operation at eight pumping stations...
Effects on River Mechanics Due to Reduction in Low-Season Discharge
India's diversion of water from the Ganges River 11 miles upstream from Bangladesh's western border during the low-flow season seriously adversely affects Bangladesh's irrigated agriculture,...
Farakka Barrage - It's Impacts and Possible Mitigation
The paper discusses the impacts and possible implications of the Farraka Barrage Project across the Ganges River on different sectors in Bangladesh including hydrology and river morphology,...
Integrated Planning for International River Basin
The integrated development of the Vardar/Axios Basin includes a system of projects scheduled to meet the needs and aspirations of Yugoslavia (in particular, the former Socialist Republic...
Contaminant Fate and Transport Model in Pool-and-Riffle Streams
The complex nature of solute transport and transformation processes in natural streams has been investigated using numerical solution of a proposed mathematical model. This model is based...
Lake Michigan Diversion at Chicago
Water has been diverted from Lake Michigan to the Mississippi River basin beginning with the construction of the Illinois and Michigan Canal in 1848 to serve navigation needs. During the...
Benefits of Hazard Mitigation Planning to Reduce Shoreline Impacts Due to Great Lakes Water Level Management Fluctuations and Severe Storms
Recent experience with flood hazard mitigation planning that encompassed aspects of pre-disaster preparedness and recovery operations have proven to be an effective tool in geographic...
The Regulation of Lake Ontario During the Spring of 1993; a Period of Record Supplies
A wet summer in 1992 and record water supplies to Lake Ontario during early 1993 resulted in very high levels on the lake. Actions by the International St. Lawrence River Board of Control...
Multi-Reservoir Systems Optimization by the Aggregation/Decomposition Methodology
Studies on long term optimization of multi-reservoir systems are enhanced by the availability of closed-loop policies as available in Stochastic Dynamic Programming (SDP). SDP offers a...
A Nearshore Model for Cleveland CSO Remediation Design Selection
Three models were combined to analyze the fate of Combined Sewer Overflows (CSOs) in the Cleveland, Ohio area. Firstly, a 20 year hindcast of Lake Erie was used to find design storms by...
Pipe Utility Evaluations With the Aid of GIS
Geographical Information Systems (GIS) are starting to be used on a day to day basis to solve community problems and optimize the use of their valuable resources. One engineering application...
Third Lake Watershed Assessment and Action Plan
Third Lake, located in Lake County, Illinois, is expected to exhibit worsening inlake water quality as development occurs within its watershed. A geographic information system (GIS) application...
Groundwater Remediation at a Superfund Site
Soil and groundwater contamination at the Montana Post & Pole site in Butte, Montana, one of the nation's oldest Superfund sites, has developed into one of the most significant...
Fate/Transport Modeling and Remediation of Contaminated Plume at Vance Airforce Base
Air Training Command (ATC) at Vance Air Force Base (VAFB) is responsible for implementing the Installation Restoration Program (IRP) according to the Comprehensive Environmental Response,...
Return to search