Liabilities in Temporary Structures Failures?Representative Case Histories
Eight case studies involving construction accidents caused by failure of temporary structures are presented. These studies illustrate the oftentimes unintended consequence of utilizing...

FHWA'S Bridge Temporary Works Research Program
The Federal Highway Administration (FHWA) has developed a research program to address bridge falsework design and construction. This resulted from the collapse of the Route 198 bridge...

Permanent Structure as Part of the Underpinning System for Boston's Central Artery
The Central Artery, a major six lane structural steel viaduct, has been one of Boston's most significant roadways over the past three decades. Increasing congestion, accidents,...

Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...

Composite Twin Tub Bridge Erection Intersection of Interstate I-84 and I-94 in Hartford, Connecticut
Curved bridge erection requires detailed preparation by the contractor, plus a sharing of responsibility and liability between the owner, designer of the new structure and the contractor....

Who Pays for the Unexpected in Construction
The problem of who pays for the unexpected in construction is discussed in relation to the testing and inspection of construction materials. Laboratory is often blamed for poor construction...

Laboratory and Field Research in Construction Automation
This paper presents a series of research projects to build and test prototype systems. It has been found that prototyping provides an economical approach to support both basic and applied...

Construction Inspection in South Carolina
The paper will discuss the experience of the South Carolina Department of Transportation in the use of consulting engineering firms on bridge construction projects. A review of the current...

Construction Inspection Responsibility from the Viewpoint of a General Contractor and Construction Manager on a GMP Project
Absent local laws to the contrary, any member of the construction team, the Owner, Architect, or Contractor, can theoretically arrange for and provide any testing and inspection that may...

Seismic Design Issues for Immersed Tube Tunnels
This paper provides an overview of the issues and the state of the art techniques in the seismic design of immersed tube tunnels (ITT). Particular focus is given to the ITT presently planned...

Effect of Temperature on Gas Transfer at Low Surface Renewal Rates
In order to investigate the dependence of gas transfer coefficients on temperature under conditions of low surface renewal rates, laboratory experiments were conducted using simultaneous...

Tracer Gas Transfer Technique for Shallow Bays
Developmental field tests using propane and Rhodamine WT tracers were conducted to adapt the tracer gas method for use in shallow bays. A special injection box was built to prevent mixing...

Gas Transfer Measurements on an Ice-Covered River
Wasteload allocation for existing and proposed pulp mills in the Athabasca River Basin of northern Alberta, Canada, necessitated measurement of the atmospheric reaeration rate, K2,...

Field Tests on a Bubbleless Membrane Aerator
A novel bubbleless hollow fiber membrane aerator has been developed and tested for the oxygenation of water. In this process pure oxygen is maintained on the inside of a bundle of sealed,...

Symposium on Ground Water
This proceedings, Symposium on Ground Water, contains papers presented at the International Symposium on Ground Water in Practice, held in...

Rehab Roundup
The concrete exterior of San Franciso's Coit Tower was damaged and the murals were being destroyed by water infiltrating the structure. Interactive Resources, Inc., Point...

Jointless Redecking
If you're redecking a bridge, why not eliminate a major cause of its corrosion at the same time? Why not remove the expansion joints? The Department of Public Works in Steuben...

Update: Bridge Scour
Nearly 500 bridges have failed because of hydraulic conditions�primarily scour�since 1950, but the collapse of the Route 90 bridge over Schoharie Creek in April 1987 focused national attention...

Quake-Safe Housing, Again
Because so little data exist about earthquake behavior of buildings that have been strengthened to meet seismic codes, many engineers are curious about the Hotel Oakland in California...

Where Does Rock Begin Beneath Philadelphia?
Philadelphia provides an excellent example of the engineering problems associated with the interpretation of saprolite/weathered rock/sound rock profiles. The bedrock beneath the city...

 

 

 

 