Flood Warning Systems
A valuable review of the current state-of-the-art of flood warning systems is represented by the papers on flood warning systems presented at the ASCE Workshop on 'Computerized...

City of Roseville, California, Alert System: Real Time Microcomputer Based Flood Warning System
The ALERT system was developed by the California-Nevada River Forecast Center of the National Weather Service. The System integrates self-reporting, field sensors, a base station microcomputer,...

PROFS Role in Modernization of the National Weather Service
This paper describes the overall modernization procedure and the computing infrastructure that will support hydrologic operations in a prototype workstation that will be available in National...

Innovative Uses of Rainfall Prediction in Urban Flash Flood Forecasting
Operational prediction of excessive convective rainfall and the ensuing urban flooding has been an integral part of the Urban Drainage and Flood Control District's (UDFCD)...

Method to Predict Cropland Ephemeral Gully Erosion
The U.S. Soil Conservation Service (SCS) in cooperation with the Agricultural Research Service (ARS) has developed a microcomputer program to provide estimates of the average annual material...

Field Measurement of Topography at a River Mouth
The authors have been measuring topography and cross section at the river mouth of the Nanakita River, in Japan. Changes of short-time scale, such as straightening of the river channel...

River Training Works in Gezhouba Project on the Yangtze
A great number of research results of the river regime planning and river training work in Gezhouba Project on the Yangtze are described together with their application in the Project....

Cold Regions Engineering
This volume contains papers that were presented at the 5th International Cold Regions Engineering Specialty Conference, sponsored by ASCE and held in St. Paul, Minnesota, February 6-8,...

Ports '89
This is a collection of the technical papers presented at the triennial Ports '89 Conference held in Boston, Massachusetts in May 1989. Authors, although predominantly from...

Cincinnati's Dream Team
For years, the cries of Cincinnati's Public Works Department and its civil engineers for infrastructure repair fell on deaf ears. In 1986, Mayor Charles Luken tried a new...

The Effects of Bank Protection on River Morphology
Revetment of bends with radius of curvature to width ratios (R/W) between 1.9 and 3.3 on Red River AR, and Sacramento River CA, does not cause the expected thalweg deepening and channel...

Probabilistic Approaches to Maintenance
All structures and their components are subject to the aging process, to wear and tear in the performance of assigned functions and to deterioration by exposure to the operating environment....

Vibration Measurements in Condition Monitoring
Vibration measurements as condition monitoring helps discovering defects and wear at an early stage, and is used to plan repairs and maintenance according to plans for water consumption,...

Automation of Existing Dam Control Schemes
For installations that are already in operation, the following advantages are obtained from installing new electronic equipment: In the case that the dam or certain measuring stations...

World Class Manufacturing and Hydro-Electric Production
Operations, maintenance, and administration and support services can benefit from the concepts of World Class Manufacturing. Cellular organizational concepts whether its machines, people,...

Upgrading Trashraking Equipment During Scheduled Maintenance Outages
Four small hydro plants in Northern California were selected by Pacific Gas and Electric Company to upgrade and automate their trashrack raking equipment during the 1988 maintenance outages....

Management System for Power Plants Tecaid Maintenance System
Operational conditions and production levels are maintained at consistently higher levels when a planned maintenance system is used. Initial operational expenses for a planned maintenance...

Trouble-Shooting Large Hydroturbine Bearings
Special problems associated with very large thrust and guide bearings and lubrication systems are presented, and cover common trouble spots, with examples. Various large hydroturbine bearing...

Hydroelectric Generator Rewinding Pitfalls and Means to Ensure Success
The failure or success of generator rewinding begins well before the actual rewind, and many of the pitfalls can be avoided if owners take some very important steps prior to the rewind...

Reduced O&M Costs through Better Metallurgy
There are many areas in hydroelectric power plants where better materials of construction can reduce operation and maintenance (O&M) costs. Some of the most nagging problems deal...

 

 

 

 

Return to search