Conservation Before and After: The Impacts of Increasing Block Rates on a Fully Metered System
Denver Water's inside residential consumption and revenues changed dramatically during a metering program and a conversion to inclining block rates. We analyze these two changes and make...

Using A Risk-Based Relative Position Analysis to Initiate Water Conservation Measures
When water utilities operate with annual demands close to safe yield, they must be prepared to invoke water conservation measures during droughts to assure adequate supply. Determining...

Parallel SDP for Multi-Reservoir Management
The use of stochastic dynamic programming (SDP) for solving water resources problems has been restricted to problems with low dimension due to the 'curse of dimensionality'. Algorithm...

Water Resources Development in the 1990's: A New Process
The development of water resources to meet future water needs has become more complex nowadays as regulatory agencies attempt to balance the proposed consumptive uses of water with a wide...

Managing the Russian River Aggregate Resources
As a result of analyzing the Russian River and its capacity to provide gravel, and through a sound examination of the geomorphology, hydrology, and groundwater conditions, the Sonoma County...

Reducing Discharges from San Francisco to the Bay
The City and County of San Francisco (City) is fairly unique in the west because it has a combined sanitary and storm water system. When the current Wastewater Master Plan (WWMP) was completed...

Reliability Analysis of a Multi-Reservoir Water Distribution System
A methodology for evaluating system reliability is developed to assist in the planning and management of a multi-reservoir water distribution system. The minimum cut-set approach is employed...

Public Involvement and Participation: Planning Imperatives for the Coming Century
The literature has identified three types of responses to natural resources planning and management efforts in the United States. The first focused upon the more effective use of existing...

Opportunities, Constraints and Change in Reservoir Management
Changing hydrologic, economic, social and environmental conditions have focused attention on the opportunities for changing reservoir management. Such change can occur in three areas....

Survey of Stormwater Detention State of Practice
A survey of stormwater professionals in the United States and Canada was conducted by the Urban Drainage and Flood Control District in 1991 regarding the current state of practice in the...

A Salmon Population Model for Evaluating Alternative Flow Regimes
Salmon populations in many Pacific coast rivers are in decline and in danger of becoming threatened or endangered. A fish population model that tracks chinook salmon from eggs to the immature...

San Diego County Water Authority's Emergency Storage Project Supplying Water During Natural Disasters
The San Diego County Water Authority (Authority) is developing the Emergency Storage Project (ESP) to improve the dependability of the County's water supplies during a natural disaster...

The Job-Order Contracting Solution
A new method of contracting, Job Order Contracting, combines many contracts into one administered by one project team. They are competitively bid, indefinite delivery, indefinite quantity,...

CAD for Small Hydro Projects
The quest to reduce design costs and improve design quality by raising productivity is familiar to every manager and designer. This article examines how CAD can play a role by examining...

Rehabbing Bridges Under Traffic
Four urban examples demonstrate how an owner's decision to keep it open during rehabilitation construction forces the designers to contend with an extra set of problems. Reanchoring...

Success Syndrome: The Collapse of the Dee Bridge
Scaling up existing successful designs can cause latent weaknesses to become dominant, leading to catastrophe. By studying past failures where this has happened--for example, the 1847...

Locking Into Success
In 1961, at Wheeler Lock in Alabama, crews with the Tennessee Valley Authority tried to incorporate an existing lock wall into a new cofferdam. A major portion of the land wall slid about...

Road to Recovery
The effect of the Loma Prieta earthquake on San Francisco's elevated viaduct system is still being felt more than four years later. Immediately after the quake, the entire...

Coastal Groins and Nearshore Breakwaters
Technical Engineering and Design Guides, as adapted from the U.S. Army Corps of Engineers No. 6. This book provides guidance for the design and placement...

Recommendations for Standards in Hydraulics
Prepared by the Task Committee on Recommendations for Standards in Hydraulics of the Hydraulics Division of ASCE. This report investigates whether...

 

 

 

 

Return to search