Constructing Around Contamination
When soil and ground water contamination are found at a construction site, completing the project on time and within budget is always a challenge. Typical problems include constraints...

Building A Barrier Wall Through Boulders
Engineers and contractors conceived a novel approach to a barrier wall at a difficult site near the Niagara River in New York State. The site had been contaminated by a chemical company...

Soil-Cover Success
After seven years of operation and extensive vertical and lateral expansions, owners of the Kingsland Park Sanitary Landfill, located in northern New Jersey's Meadowlands,...

National Water Resources Regulation
Where is the Environmental Pendulum Now?
This proceedings, National Water Resources Regulation - Where is the Environmental Pendulum Now?, presents papers from the Specialty Conference...

Reconstruction of the West Breakwater at Port Sines, Portugal
This volume, Reconstruction of the West Breakwater at Port Sines, Portugal, is a collection of papers presented at a seminar held at Sines,...

Revenue Enhancement for Water and Wastewater Systems
This proceedings, Revenue Enhancement for Water and Wastewater Systems, examines techniques used in the water and wastewater utility industry...

Spanning the Grand Canyon
Replacement of a bridge across the Grand Canyon challenged engineers to create a design in keeping with the area's beauty, history and protected environment. Their answer...

Computer Control of CSOs
Like many older cities, St. Louis has a combined sewer system and is faced with the difficulties of dealing with combined sewer overflows (CSOs). The Metropolitan St. Louis Sewer District...

Fishy Business
Hydroelectric power accounts for about 12% of U.S. electric supply and virtually all the nation's renewable energy capacity. Yet hydro is under increasing attack on environmental...

Argentina: Back in Business
Having achieved democracy and stabilized its economy, Argentina is working to improve its transport, telephone and power systems and to ease its housing shortage; the local construction...

Applying Sustainable Development
Experts hoping to lessen the harsh effects of development on Earth's ecosystem have turned to the concept of sustainable development. Engineers are finding old ways to put...

Regulatory Views on Seismic and Fault-Displacement Parameters Needed for a Geologic Repository Design
This paper presents the regulatory views of the U.S. Nuclear Regulatory Commission staff on some of the significant issues related to the seismic and faulting design of a geologic repository....

Scoping the Monitoring Instrumentation to Meet Repository Design and Construction Needs
This paper discusses categories of instruments that are available and recommended for consideration to monitor the engineering performance and interactions of the geologic media, groundwater,...

A Natural Cleanup
For almost 30 years, nonvolatile petroleum hydrocarbons from used motor oil, diesel, gasoline and other automotive fluids had been released to an oil sum at a truck-maintenance facility...

MSA for VOC Removal
In what may be the first large-scale application of its type, mechanical surface aeration�usually used in wastewater treatment�is removing volatile organic compounds from potable ground...

Sampling Sediment on a Complex Site
The remedial design of a complex Superfund site hinged on a variety of sampling methods required by the site's diverse terrain. Cadmium, lead, cobalt and nickel are the culprits...

Seismic Design Considerations for Uplifted Tanks
An evaluation of the most commonly used seismic design procedures for unanchored tanks is presented. It is noted that current standards are inconsistent in predicting the behavior of unanchored...

Seismic Strengthening of Johnstown Tank in Lakeside, California
Seismic overturning moments exerted on liquid storage tanks may be resisted by a system of anchor bolts if the shell could be adequately anchored to its base, or by allowing the base plate...

Concrete Arch Bridges for Supporting Steel Conduits of Mingtan Pumped Storage Project
For the Mingtan Pumped Storage Project of an installed capacity of 1600 MW, two parallel waterways have been constructed for conveying flows between the upper reservoir and the lower reservoir...

Nonlinear Dynamic Analysis of Single Point Moored Buoy Under Wave and Current Loadings
In this study, a single point moored spherical buoy under wave and current loadings is analyzed in the time domain considering time memory effects. Geometric nonlinearity of the mooring...

 

 

 

 

Return to search