Construction Management at Sikes Superfund Site
Lockwood, Andrews & Newnam, Inc. (LAN) is providing Construction Management services on the Sikes Superfund site. The project involves constructing an incinerator on-site and incinerating...

Noise Control Program for the Boston Harbor Project
A noise control engineering program has been instituted for the Boston Harbor project to make the facility virtually inaudible at the property line. The program integrates the noise mitigation...

Environmental Protection, Resource Allocation and CERCLA: A Practitioners Perspective
In accepting Superfund's mandate of protection of human health and the environment in a timely manner, critics often overlook, the limited human, technical and material resources...

High Level Radioactive Waste Management 1991
The proceedings of the second annual international conference on High Level Radioactive Waste Management, held on April 28 - May 3, 1991, Las Vegas, Nevada, provides information on the...

Unit Pricing and Unbalanced Bids
Unit price contracts were meant to provide a simple and equitable way to pay contractors. However, to offset the uncertainties inherent in construction, contractors unbalance bid items....

Setting Standards in San Diego
Most engineering firms have developed specifications and standards that become the bible for project-related design issues�and no two firms are the same. On complex, large-scale projects...

Pumped Storage Promise
With many utilities facing potential shortfalls in generating capacity, pumped storage hydro plants could be a key to meeting peak-period energy demand in the 1990s. Pumped storage plants...

Probabilistic Analysis of Modernization Options
Benefit-cost analysis is a standard procedure for reaching planning decisions. Cost overruns and benefit shortfalls are also common occurrences. One reason for the difficulty of predicting...

Evaluating the Dynamic Operating Benefits of Hydro Power Plants
In 1986, the Electric Power Research Institute asked Decision Focus to develop a new planning model to quantify the dynamic operating benefits of power technologies that offer operating...

When FERC Investigates Your Unlicensed Project: A Five-Point Protection Plan
A FERC investigation into a project's jurisdictional status poses the potential for substantial risks and costs. This paper outlines a 'five-point protection...

Hydropower: Making Its Mark in North America
To discover what plans North American hydropower producers have for their hydroelectric resources in the 1990s, Hydro Review conducted a survey of leaders in the hydro generation industry...

Dealing with the Difficult Utility
The experience of an independent hydroelectric power developer, STS HydroPower, Ltd. (STS), involved in the full scope of hydroelectric activities is desribed. The purpose of the paper...

EPRI's Pumped Storage Planning and Evaluation Guide
EPRI's Pumped Storage Planning and Evaluation Guide was published in 1990. The Guide provides step-by-step procedures to: (a) evaluate pumped-storage operation in a utility...

Small and Low Head Pumped Storage Projects
With the recent completion of several very large pumped storage projects, the perception of a hydroelectric pumped storage project in some power industry circles may be that of a project...

The PEC Headworks Project?A Cooperative Hydropower Development
The PEC Headworks Project is a single-unit hydroelectric facility located at the headworks of the Potholes East Canal at O'Sullivan Dam on the Potholes reservoir near Moses...

Lake Siskiyou Power Project
The Lake Siskiyou Power Project was constructed at the foot of the existing Box Canyon Dam on the Sacramento River in Northern California. Major project features included the construction...

Small Hydro Site Ranking, Cost Methodology and Program
The user-friendly micro-computer program SHYDRO for costing small hydro has been prepared for the government of Canada and is available in the public domain. SHYDRO was initially applied...

Geotechnical Aspects of the Underground Excavations at the Kemano Completion Project
The Kemano Completion Project is the addition of four generators of 540 MW installed capacity to an existing eight-unit underground hydroelectric generating station owned and operated...

Evaluating Hydro Project Benefits with the POWRSYM Production Cost Model
The contribution that a hydro peaking project or pumped-storage project makes to reducing system operating costs can be determined only by modeling the project's operation...

Outlet Works Modifications at Abiquiu Dam
For the installation of a hydroelectric project at the Corps of Engineer's Abiquiu Dam in New Mexico, outlet works modifications that would not affect the structural integrity,...

 

 

 

 

Return to search