Determination of Values of Project Storage for Hydropower Scheduling
The Columbia River is characterized by multiple and sometimes conflicting uses, and its basin extends over many political jurisdictions. To balance pluralistic needs and authorities with...

Managing for Multiple Uses?Theory and Practice
One of the gratest challenges given to reservoir operators is to provide an operating regime that will accomplish the objectives for which the project was constructed. This is important...

Marketing Power in the Pacific Northwest
The marketing of power in the Pacific Northwest is a process intimately tied to the management of the Columbia River system. This paper describes the characteristics of the river and transmission...

Columbia River Treaty Perspectives
The Columbia River Treaty was signed in 1961 and ratified by the governments of Canada and the United States in 1964. The Treaty required British Columbia to construct three large storage...

Simulation of Irrigation and Reservoir Water Use
Computer simulation of irrigation water use and corresponding downstream reservoir operation has been developed for the Canyon Ferry Reservoir on the Missouri River in Southwestern Montana....

Hydropower Development of China's Yangtze River
The Yangtze has eight times the hydro potential of the Columbia River basin, currently the largest developed hydro system in the world. In order to pursue economic development through...

Optimal Operation of the Savannah River System
This paper presents an application of a stochastic control method to the real time operation of the Savannah river system which includes three reservoirs and is expected to meet energy...

Hydrologic Studies for Dinkey Creek Hydro-Electric Project
The economic analysis and final design of the 120 MW hydro-electric development on Dinkey Creek, a tributary of the North Fork of the Kings River in the Central Valley of California, requires...

Estimating Streamflow Characteristics for Micro-hydro Sites in Northwestern Oregon
Assessing hydropower potential requires knowledge of the streamflow characteristics at prospective sites. Gaging stations are often unavailable. A method for estimating streamflow characteristics...

The Role of Headwater Benefits in Hydropower Planning
Headwater benefits are the power benefits that accure to owners of downstream hydroelectric plants as a result of the operation of headwater improvements. The retention of water in upstream...

The Effect of Sedimentation on Hydro-Developments
This paper will discuss two major impacts which are the hydro construction on natural stream sedimentation and the sedimentation related problems during hydro operation. The two types...

Performance of Draft Tubes for Small-Hydropower Turbines
Tests of several conical and elbow-type draft tubes were conducted with varying degrees of upstream swirl. This swirl was generated by variable-geometry vanes. Draft tube efficiencies...

Designing a Modern Small-Scale Hydroelectric Plant
STS Consultants, Ltd. (STS) and Skidmore, Owings & Merrill (SOM) successfully teamed on four hydropower sites in Michigan during the 1980's. Three of the four sites...

Milltown Powerhouse Rehabilitation
The Milltown Powerhouse and dam are over 80 years old. The powerhouse and other structures were built in 1906 and are owned by the Montana Power Company. The plant is located on the Clark...

Modern Technology in an Ancient Environment?The Answan II Power Plant
The Aswan II power plant is located at the old Low Aswan Dam in Southern Egypt. This dam was constructed in the early years of the century in order to provide irrigation water for cash...

New Martinsville Hydroelectric Project
The 34MW New Martinsville Hydroelectric Project is presently under construction in West Virginia. Located at Hannibal Locks and Dam near river mile 126 downstream from Pittsburgh, PA,...

Single Conduit Dam Design
In today's arena of increasingly higher costs for major dams, planners and designers are continuing to look into ways of reducing the overall costs for the development of...

Sidney A Murray Jr. Hydroelectric Project
The Sidney A Murray Jr. Hydroelectric Project is being designed and constructed by EBASCO Services Inc. for the City of Vidalia (La) - Catalyst, Old River Hydroelectric Ltd Partnership....

Osoyoos Lake Control Structure
The new Osoyoos Lake Control Structure has been built on the Okanogan River at Oroville, Wa. The site is about 2 miles downstream from the outlet of Osoyoos Lake, and about 9 miles south...

Dongjiang Project and Development of Lei River
Lei River in the south of Hunan Province is a tributary of Xiang River, flowing northward to the Yangtze River. Dongjiang has been selected as the key project to be constructed for hydropower...

 

 

 

 

Return to search