How do Integration and Data Models Add Value to a Project?
Integration has been at the forefront of research agendas of universities and restructuring efforts of companies in the past few years. However, we are still lacking a common understanding...
Object-Oriented Process Modeling to Support Cooperative Planning in Industrialized Building Construction Project
This paper presents current research and develop on process modeling that can support cooperative planning among designer, engineer, project planner and project manager in industrialized...
Flexible Extracation of Practical Knowledge from Bridge Databases
Bridge databases contain significant information that can assist in future bridge management decisions. The effective utilization of this information requires facilities for the flexible...
Performance of New York's Long-span Bridges
This paper is a work-in-progress report on a database on the performance of long-span bridges located in New York State and built between 1801 and 1993. Of the 68 long-span bridges - bridges...
Modeling Initial Mixing of Ocean Wastewater Discharges to Develop Toxic Effluent Limitations
The UM model, released by USEPA in 1992, was utilized to simulate the initial mixing of a discharge to the Atlantic Ocean near Ocean City, New Jersey. The study included field verification...
An Interactive Computer Code for Generations of Artificial Earthquake Records
A new interactive computer code is presented in this work for the calculation of artificial earthquake records that comply with any arbitrarily specified target response spectra or power...
A Knowledge-Intensive Database System for Making Effective Use of Construction Lessons Learned
The Constructability Task Force of the construction Industry Institute (CII) sponsored as series of studies which advocate construction expert input to the conceptual planning, engineering...
Creating and Abstracting Lessons-Learned from BCO Reviews
This database allows reviewers searching for relevant past expertise access to a relatively small set of comments that have been retained frequently for past reviews. The ability to order...
Three-dimensional Modeling for Improving Construction Process Performance
This paper presents experimentation regarding a model for deciding the optimum number of resources that should be allocated to a project. Measures of task and process flexibility are used...
Alternative Decisions for Space-Based Scheduling in Multi-Story Projects
SCaRC (Space-Based and Resource-Based) is a prototype knowledge-based scheduling system that acknowledges work space as a scheduling constraint. The SCaRC system comprises different scheduling...
Extended Topology in Building Design Systems
An important aspect of CAD systems for building design concerns the description of the form of the building, the definition of operation on that form and the way these operations are offered...
Integrated System Environment Using an Object-Oriented Project Model with Multiple-Views
This paper describes the development, present status and future directions for PMAPM, an object-oriented project model designed to facilitate information sharing along the paths through...
Computerized Building Settlement Analyses for a Contaminated Groundwater Remediation Project
The use of spreadsheets is becoming ever more popular in the practice of civil engineering. Engineers are able to use this tool to meet deadlines which were once insurmountable. This paper...
Use of Database in Geo-environmental Engineering
Geo-environmental projects are becoming increasingly complex requiring rigorous mathematical computation and analysis of large amounts of data. This paper looks into how a geo-environmental...
Creating Construction Documents from 3-D Computer Models
Structural engineering tasks can be broken down into three major phases; analysis, design and construction document production. Although automation techniques have focused on these phases...
The Design of a Proactive Cost Feedback System for Construction Project Management
Cost projection in project management requires the adjustment of historical costs to reflect the expected context. Improved cost projections require the incorporation of all relevant contextual...
A Multi-Media System for Organizing Construction Documents
This paper describes the concepts for a system to manage construction documents in a multi-media environment to support efficient retrieval....
Expert System for Bridge Scour and Stream Stability
Significant engineering judgment is required to ascertain the scour susceptibility of bridges. This judgment is typically acquired through many years of experience. This paper describes...
A Hypermedia Constructability System
Traditional civil engineering follows as segmented process of design then construction. Separating the two provides a system of accountability and creativity. One of the shortfalls with...
Multimedia Based System for Analyzing Production Organizations
Construction operations involve many complex operations and relationships. This paper deals with data gathering for productivity improvement-studies, process modelling and simulation of...
Return to search