Lopez-Angostura Power Tunnel
The Lopez-Angostura Project is located on the Yaque del Norte River in the Dominican Republic near the City of Santiago. A 24 m high dam, a 3.6 km long power tunnel, a pit powerhouse with...
Tunneling through an Existing Concrete Masonry Dam
The Gregory B. Jarvis Hydroelectric Project is located in Upper New York State on the West Canada Creek. Existing facilities include a non-overflow concrete gravity dam, 65 feet long and...
China's Ertan Hydroelectric Project
Ertan will be a major hydroelectric project on the Yalong River in China. The project consists of a 240 m high arch dam, two tunnel spillways, an overflow spillway, mid- and low-level...
Design Considerations for a Penstock Located in an Outlet Tunnel at the Jennings Randolph Dam in West Virginia
The proposed production of hydropower at this flood control-recreation dam involves the installation of a 78 inch diameter steel penstock at the crown of the existing tunnel. The penstock...
Analysis and Rehabilitation of Ambursen Dams
This paper deals with the investigation and analysis of two Ambursen dams located in the upper Midwest. These investigations revealed that the original design contained significant defects,...
Dam Rehabilitation and Fish Lift Design at the Pejepscot Hydroelectric Project
The rehabilitation work on the existing rockfilled timber crib dam comprised an assessment of the existing dam stability; analysis of the existing hydraulic conditions to establish the...
Safety Evaluation of PG&E Dams
Pacific Gas and Electric Co. (PG&E) owns and operates 71 hydroelectric power projects in Northern and Central California. With 115 dams in its system, PG&E is the largest...
Ghost Dam Safety Evaluation
Ghost Development, owned and operated by TransAlta Utilities, is near the eastern margin of the Rocky Mountain Foothills, approximately 33 km northwest of Calgary, Alberta. The development...
Geology Related Construction Problems at the Urugua-i Hydroelectric Project
The Urugua-i Hydroelectric Project in north-eastern Argentina consists of an 80 m high roller-compacted concrete dam, 4.4 km long lateral dike, 800 m long power tunnel, and a 120 MW powerhouse....
Newfoundland's First Arch Dam Construction Versus Climate
Paradise River arch dam is located in a narrow box canyon about 50 m deep and less than 10 m wide at streambed. It is a thin arch dam, especially sensitive to temperature loads, thus contraction...
In-Situ Shear Strength Testing
Dam stabilization requirements at the Upper Mechanicville Hydroelectric Project on the Hudson River in New York were significantly modified based on the results of an in-situ direct shear...
The Construction of the Sidney A. Murray, Jr. Hydroelectric Power Plant
The project, consisting of eight 8.2m bulb turbines rated at 192MW, is located in the State of Louisiana and will use a portion of the water diverted from the Mississippi River to the...
Feasibility, Licensing and Design: Bradley Lake Hydroelectric Project
This paper describes the licensing, environmental, engineering, and design aspects of the project. Due to the project's remote location and geological setting, the paper will...
Analyses of the Lower San Fernando Dam Failure
The main methods employed for the back analysis of the behaviour of the Lower San Fernando Dam during the 1971 earthquake are described. The requirements for a comprehensive analysis are...
Analysis of Concrete Gravity Dams Using Microcomputers
Monenco Consultants Limited has developed a microcomputer program entitled 'DS2' for the stability analysis of concrete gravity dams. This paper discusses this...
Evaluating Uplift Pressures for Concrete Gravity Dams
An approach for evaluating uplift and dam foundation conditions, which resulted from the initial phases of an Electric Power Research Institute (EPRI) study is presented. An earlier study...
Domed Renovations
Inside the granddaddy of domed stadiums, the Houston Astrodome, 10,000 new seats and 72 new suites were hung from a strengthened structure. Using a variety of working-with-what-we've-got...
Asphalt-Rubber Concrete?A New Horizon
The performance of asphalt concrete pavements is dependent to a large degree upon the rheological properties of the asphalt binder. Asphalt-rubber as a binder material extends the temperature...
SPIDA Method for Reinforced Concrete Pipe Design
The required supporting strength of buried pipe is affected by the total load that is imposed upon the pipe and the manner in which the pipe is supported by the surrounding soil. The installation...
Hot Mix Asphalt Utilization in Railway Trackbeds
Described herein are the rationales for, descriptions of and evaluations of hot-mix asphalt (HMA) trackbed rehabilitation and construction techniques recently utilized in various classes...
Return to search