Cumulative Impact Assessment: Application of a Methodology
The authors expanded upon the Federal Energy Regulatory Commission's (FERC) Cluster Impact Assessment Procedure (CIAP) to provide a practical methodology for assessing potential...
Instream Flow Methodologies and Requirements
Instream flow is a term applied to the discharge occurring downstream from and at least partly controlled by a dam or diversion structure. The volume and timing of instream flows most...
Reservoir Regulation in the Monsoon Climate of Korea
An examination of reservoir regulation rules in light of uncertain estimates of river flow in the Han River Basin, Republic of Korea, shows that two strategies will improve total hydroelectric...
Multisite Hydrocomplex Optimization
A multisite complex is analysed in northern Quebec to decide the level of equipment needed that will supply firm energy at the best possible unitary price. Four possible sites were chosen...
The Use of Time Series Analysis to Estimate Flow Duration Curves to Assess Energy Potential for Low Head Hydro Redevelopment
The proposed hydroelectric site location has a low head potential making discharge the primary energy production component. A flow duration curve (FDC) study was commenced to generate...
New Martinsville Hydroelectric Project
The 34MW New Martinsville Hydroelectric Project is presently under construction in West Virginia. Located at Hannibal Locks and Dam near river mile 126 downstream from Pittsburgh, PA,...
A Mathematical Model for Traveling Screens at Hydropower Plants
Hydroelectric projects cause significant mortality to fish migrating downstream. The current method to reduce fish mortality at hydropower plants is the use of traveling screens. In this...
The Impact of Inlet Flow Characteristics on Low Head Hydro Projects
This paper discusses the intake civil designs, addressing head loss and flow distribution into the turbine intake. The impact of poor flow quality on head losses, turbine performance,...
Application of Split Roller Bearings in Small Vertical Hydro Turbines
The elimination of lower turbine bearing problems with regard to reliability and water flow contamination was the main concern of this project. A design was needed that would fit the existing...
Prototype Experience With Acoustic Flowmeters
The acoustic (ultrasonic) flowmeter offers many advantages over other methods for measuring discharge in penstocks for turbine performance tests. It is nonintrusive, inexpensive and may...
Tracer Dilution Flow Measurement Application to Short Penstock Length
Absolute performance evaluation of hydro-turbines requires the determination of flowrates. Flow measurement is probably the most difficult aspect of determining a unit's efficiency....
Turbine Efficiency Monitoring Utilizing Ultrasonic Flowrate Measurement
On-line turbine efficiency measurement can be achieved by ultrasonic flowrate measurement and state-of-the-art data acquisition techniques. A field performance test program conducted at...
Kaplan Blade Angle Controller
This paper describes a recently developed computerized Kaplan blade angle controller that is capable of improving turbine performance. Model Tests or Index Tests produce the Three-D-Cam...
Upper Yellow River Projects and Longyangxia Station
The river stretch from Longyangxia to Qingtongxia, with a head drop of 1,465 m in a distance of 1,023 km (including backwater length of the Longyangxia Reservoir) is the focus of this...
Evaluation of Reservoir Seepage in Karst Topography
Areas where seepage is likely to occur in the karst environment of the proposed West County Reservoir, Roanoke County, Virginia have been indentified. Solutioning exists in the form of...
Flow Behavior of Kinked Strip Drains
Due to the often expressed concern over the axial deformation of strip drains and the resulting impact on flow rate, this study has been undertaken. A laboratory experiment has been constructed,...
Regulatory and Environmental Issues of the Chisman Creek Superfund Site
This paper discusses the regulatory and environmental issues arising from the response to the Record of Decision (ROD) for the Chisman Creek Superfund Site in York County, Virginia. Field...
Polyhedral Substitute Yield Conditions in Plastic Reliability Analysis
The method of invariant linear combinations of linearly associated lower bound safety margins is used for constructing upper bound approximations of the generalized reliability index with...
First-Order Reliability Analysis of Groundwater Flow
A method for stochastic analysis of groundwater flow based on the first-order reliability approach is presented. The method is well suited for problems in which statistical information...
Characteristics of Nonstationary Response of Linear Systems
A new formulation for the statistics of the response of linear systems to nonstationary excitation is developed. Both the process and its envelope are examined and exact statistics are...