Selection of the Form of Calculated Flood Hydrograph in Projecting Water Release Facilities
Traditionally, in evaluating hydraulic structures, river flood runoff hydrographs are determined by maximum flood water volume and discharge, duration of the flood and some other parameters,...

Risk-based Analysis of Major Rehabilitation of Hydraulic Structures Using REPAIR
This poster session presents a demonstration of a computer model developed by the Corps of Engineers to analyze investment proposals. The primary purpose of the model is evaluate investments...

The Timberlake Dam Failure: A Hydrometeorological Assessment
Extremely heavy rainfall over the Timberlake basin in southwest Virginia on 23 June 1995 caused an earthen dam to fail and resulted in fatalities. The meteorological conditions are examined...

Computational Tools for Subsurface Conceptualization
Development of subsurface conceptual models for use in groundwater flow and transport modeling requires that existing data in the form of boring logs, cone penetrometer (CPT) logs, geophysical...

European Progress on river Renaturalisation
Most restoration projects in Europe have been designed to maximise species richness with little regard for channel stability. To recreate a sustainable natural channel it is necessary...

Ecological and Biological Considerations in River Restoration
When planning river restoration projects, proper consideration must be given to the target resources of concern. This should include provisions to meet the physical, hydraulic, and biological...

Role of Vegetation in Hydraulics of Channel Restoration
Boundary layer theory is used to develop a backwater model for flows through vegetated waterways which can be employed to approximately estimate flow depth variation in channel restoration...

A System Approach for Identifying and Improving Hydraulic Numerical Modeling Reliability
A system response approach which uses Fourier transform through a multiple-input/ single-output (MISO) nonlinear system to evaluate the model performance of verification and simulation...

Utilizing Geomorphic Analogs for Design of Natural Stream Channels
Engineering guidelines for the design of stable rock armored channels are well established. However, few guidelines exist for designers involved with the reconstruction of channels with...

Selection of Sediment Transport Relations Part III: Numerical Ranking of Sediment Transport Relations
The emphasis of this paper is the methodology for the selection of sediment transport relations and is applicable for analysis of any sediment transport relation. However, to illustrate...

Impact of Reservoir Flood-Control Operation on Interior-Drainage Facilities
Sacramento, CA is protected from floods of the American River by Folsom Dam and a system of levees. Proposed modifications to the flood-control operation of Folsom will increase downstream...

Numerical Modeling of Flows in Ultraviolet Disinfection Channels
Current design methods for UV disinfection facilities depend largely on experience with minimum input design variables, such as water UV transmittance and required disinfection efficiency....

Measurements of Bridge-Scour Depths in Mississippi
This paper briefly summarizes 190 measured pier-scour depths collected dur ing 1942?94 at 22 selected bridges in Mississippi and presents an envelope-curve equation for the data. The envelope-curve...

Design Guidance?Instream and Bank Restoration Structures
Despite an urgent need for river and stream restoration design criteria, little guidance has emerged in recent years. Existing guidance is largely unsatisfactory, promoting empiricism...

Design Guidelines for Bioengineered Bank Stabilization
Design of bioengineered slope stabilization measures in riverine environments to minimize rates of stream bank erosion requires accounting for hydrologic, hydraulic, geomorphic, geotechnical,...

River Restoration Considerations Beyond Channel Design
Restoration of river systems in highly disturbed environments poses unique challenges beyond channel design. The Jordan Creek Restoration project in Idaho was conducted in a valley disturbed...

McAlpine Intake Model Study for Innovative Lock Design
The McAlpine Locks and Dam Project is located on the Ohio River near Louisville Kentucky. Construction of an additional 33.53-m-wide (110 ft) by 365.76-m-long (1200 ft) navigation lock...

Filling and Emptying System Model Study for the Innovative Lock Design
Funding constraints have generated innovative ideas regarding the hydraulic system of proposed navigation locks. Two fundamental questions addressed in the innovative lock design study...

Sims Bayou: The Public Speaks?The Corps Listens
After about ten years of coordinating, planning, engineering, and design, advertising the first construction contract for the Sims Bayou flood control project was only months away. At...

Restoration of Abandoned Meanders on the Middle Fork Forked Deer River, Tennessee
The Middle Fork Forked Deer River in western Tennessee historically had a sinuous course within a wide floodplain. In the early 1900's, local interests dug large straight...

 

 

 

 

Return to search