A Rapid Post-Earthquake Damage Detection Method for Underground Lifelines
The present paper discusses a methodology for rapid, post-earthquake damage detection for underground lifeline systems. The methodology integrates model verification and system vulnerability...
Lifeline Seismic Risk Analysis Impacts of a Catastrophic Earthquake on U.S. National Lifeline Systems
Electric power, water, gas, and oil pipelines, highways, railroads and several other lifelines of critical importance at the U.S. national level have been inventoried and analyzed, to...
Earthquake Loss Estimation Modeling of the Seattle Water System Using a Deterministic Approach
This paper summarizes the project and resulting report entitled Earthquake Loss Estimation Modeling of the Seattle Water System (Ballantyne, 1990) conducted under funding from the United...
Understanding the Earthquake Environment, Corporate Strategies
Corporations should understand the impact that earthquakes may have on their ability to function. Some earthquake related issues which face a corporation are: earthquake design levels...
Preliminary Earthquake Mitigation Planning to Improve Watermain Performance in Vancouver, B.C.
City of Vancouver's water transmission and distribution system is vulnerable to over 1,000 pipe leaks or main breaks from a probable large earthquake (about 7.5 M). Cast iron...
Elevated Water Tank Inelastic Seismic Analysis
In 1988, the Seattle Water Department hired CYGNA, a consulting firm, to assess the seismic reliability of their water system, since major earthquakes can occur in the area. Their study...
Loss and Recovery of Critical Lifelines Following Recent Hurricanes
Hurricanes significantly affect the performance of critical lifelines. An overview of the loss and recovery of power supply, transportation, communication, and water/wastewater systems...
Error Rate Measurements of RDS-FM Transmissions Application to an RDS-Beacon
The Radio Data System is now commonly implemented on many European VHF-FM broadcasting transmitters. RDS provides for the transmission of a silent data channel on existing VHF-FM radio...
Baia dei Gabbiani (Seagull Bay) Marina in Marano Lagoon, North Adriatic Sea
In Northern Adriatic Sea between Venice and Triest, a new Marina, designed by the Author, has been built. In it 281 boats, with L.O.A. varying from 10 m to 25 m, are moored in the harbor...
A Case Study of Propeller-Induced Currents and Sediment Transport in a Small Harbor
The operation of vessels in marinas and small harbors can provide important driving forces affecting ambient circulation patterns and current speeds near the bottom. The case study on...
Utility Metering Versus Sub-Metering and the Methods Available
This paper is intended to bring to light the necessity to meter electricity that boat owners use. We will discuss the theory and components that go into electronic meters. The economics...
Guide to Post-Earthquake Investigation of Lifelines
This committee report,
Guidelines for Electrical Transmission Line Structural Loading
This manual presents detailed guidelines and procedures for developing transmission line structure loads. It is divided into four sections. The first section is concerned with the load/strength...
Lifeline Earthquake Engineering
This proceedings,
Regarding Nature as Raw or Cooked
Tensions between nature and technological culture are mounting as never before. On one side are the deep ecologists who claim the industrial capitalist system has raped the world of nature....
Fly Ash for Hire
Each year, roughly 15 million tons of ash created by U.S. coal-fired powerplants is recycled. Most is used in concrete and other construction materials, such as structural fill, but utilities,...
Hydropower's Balancing Act
Relicensing applications are due at the end of 1991 on some 170 hydro plants across the U.S., a large percentage of the more than 400 plants that will go through the process by 2010. Conditions...
Retrofitting Fossil Plant Facilities Structural Perspectives
This publication, Retrofitting Fossil Plant Facilities: Structural Perspectives, was prepared by the Retrofit Task Committee of the Fossil Power Committee of the American Society of Civil...
Analyzing Risk
Engineers designing major projects must often grapple with large areas of uncertainty�from estimating the seismic hazard to a nuclear powerplant to the potential effects of decades of...
Reliability of Large Technological Systems
Codes and regulations regarding large technological systems of growing complexity should take into account the increasingly sophisticated analysis tools that have been and are being developed...