Analysis of Dredged Material Deposition Patterns
Between November 1, 1989 and 30 March, 1990, nearly 1 million cubic yards of dredged material were disposed in Puget Sound as the first phase (Element I) of the construction of the Navy's...
Dredged Material Placement Techniques?A Review of Its Past, Present and Future
Maintenance of ports and harbors requires considerable amount of dredging and this makes studies on dredged material disposal and placement technique particularly important. This paper...
Land Reclamation Design for the Port of Los Angeles' 2020 Plan
In order to meet future cargo demands the Ports of Los Angeles (POLA) and Long Beach in conjunction with the United States Army Corps of Engineers have conducted a long-range planning...
Minimizing the Risk and Impact of Tanker Accidents
The paper reviews the risks of bulk liquid spills from tankers and tanker barges during transport and transfer and discusses means of minimizing the risk of spills. The use of spill modelling...
Recycled Materials for Port Construction
The concept of utilizing recycled materials is presented. Types of materials which may be applicable are described, as well as, typical projects utilizing these materials....
Honolulu Harbor Ship Traffic Simulation and Animation Study
A computer simulation and animation study was conducted to investigate the operational impacts of projected ship traffic increases and harbor reconfiguration specified in the Honolulu...
Spatial Decision Support System for Toxic Spill Modeling in the Ohio River
Spatial decision support systems (SDSS) are hardware-software systems that incorporate spatial analysis and modeling in a workstation environment. The Ohio River Valley Water Sanitation...
Multiuser Sites for Contaminated Sediment Disposal
The Washington Department of Ecology (WDOE) recently adopted a program to identify, rank, and clean up contaminated sediment sites in Puget Sound. Site cleanup, in conjunction with dredging...
Interpreting Dredge Material Bioassay Data?COBIAA
Two types of sediment bioassays may be conducted in the regulatory evaluation of dredged material, toxicity tests and bioaccumulation tests. COBIAA (for the Consequences of Bioaccumulation...
An Overview: Wetland Restoration, Protection, and Establishment by Beneficially Using Dredged Material
Dredged material has been used beneficially by mankind for many years; in the past two decades it has purposely been used to restore and protect existing wetlands, and to establish new...
Groundwater Recovery Program for Southern California
Under its new Groundwater Recovery Program (GRP), The Metropolitan Water District of Southern California will improve regional water supply reliability by providing financial assistance...
Analytical Prediction of Gasoline Thickness on the Water Table
With the increased use of immiscible fluid products such as gasoline, the threats to groundwater resources by hydrocarbon products are increasing. The success of recovery of the hydrocarbon...
A Demand Driven Decision Support System for Operation of Reservoirs
In this paper a stochastic optimization model, called Demand Driven Stochastic Dynamic Programming (DDSP) is developed and is compared with a Bayesian Stochastic Dynamic Programming (BSDP)....
Applying the ARMOS and MOFAT Models to a Major Oil Spill
A study was undertaken to evaluate the impact of a crude oil pipeline rupture in the recharge area of the aquifer serving most of West Tennessee. The main challenge was to model the volume...
Reliability of Operating Rules with or without Uncertain Forecasts
In this study the reliability indices are calculated for operating policies generated by three Stochastic Dynamic optimization models: a classical Stochastic Dynamic Programming (SDP);...
Infrared Thermographic Sensing of Sewer Pipeline Problems
When a sewer caves in, it often takes the street, sidewalks, and surrounding buildings along for the ride. These collapses endanger public health and safety. Repairing a sewer before such...
Design of Municipal Wastewater Treatment Plants
This manual,
Engineering Mechanics
This proceedings,
Building Better Bridges: Concrete Vs. Steel
The authors debate the merits of concrete segmental and steel bridge design and construction based on five criteria: initial and life-cycle costs; structural advantages; durability; construction...
Investigation of a Concrete Blistering Failure
During construction of a concrete pavement at a military airfield, numerous small blisters formed on the concrete surface behind the slipform paver and were filled by the contractor using...
Return to search