Implications of Uncertainty in Transportation Control Measures: A Case Study of the Los Angeles Truck Management Program
The Los Angeles Department of Transportation has proposed a peak period travel restriction aimed at heavy-duty trucks on all Los Angeles streets. The ordinance is designed to reduce the...
Case Study of Electronic Toll Collection in the Central Artery/Tunnel Project?Boston
The purpose of this paper is to discuss the issues involved in incorporating new technology, specifically electronic toll collection into a large, long-term construction project. The paper...
Overview of Current U.S. HSGT Planning
As an introduction to the subject of high-speed ground transportation (HSGT) and to help put the rest of the conference papers in context, two plenary sessions provided an overview of...
High Speed Transportation for the 21st Century: Florida's High Speed Rail and Maglev Projects
This paper presents a brief status report on the State of Florida high speed ground transportation efforts. It includes a description of the amended high speed transportation act in Florida...
High Speed Rail: An Alternative Route to Preserve Quality of Life in the Northwest
The impacts of population growth threaten quality of life in the Pacific Northwest. Existing transportation systems cannot meet projected demand nor special needs of an aging society....
Land Use Planning and HSGT Station Development: The Maglev Grand Terminal/International Drive Experience
In 1996, the Future arrives in Orange County, Florida. It is the ribbon cutting ceremony for the high-tech, high-speed ground transportation magnetic levitation train, connecting the Orlando...
Magnetic Levitation (Maglev) System Integration with Other Urban and Inter-City Transportation Modes
Hypothetical intracity maglev routes are applied to 11 United States metropolitan areas to enhance intermodal passenger transfers at existing bus terminals, metro stops, rail stations,...
High Speed Ground Transportation on U.S. East Coast
The United States has entered into a new era of need for domestic improvement. The demand for high speed transportation far exceeds the supply. The increasing congestion of our roads and...
California-Nevada Superspeed Train Experience and Outlook
The experience of the California-Nevada Superspeed Train is chronicled from its inception in 1970 to the present. The evolution of the route alignment and technology selection are presented,...
The Pittsburgh Maglev Project
MAGLEV, Inc. is a public/private/labor partnership created in response to the ever growing need to provide new transportation solutions to the escalating problem of highway and airport...
Noise from High Speed Maglev Transportation Systems
Noise levels from magnetically levitated trains (maglev) at very high speed may be high enough to cause severe environmental noise impact in residential areas, even without physical contact...
A Combined Noise Model for HSGT Traffic
Environmental concerns are high on the list of possible problem areas for proposed high speed ground transportation (HSGT) systems. A Federal Highway Administration (FHWA) Highway Traffic...
Estimating the Ground Transportation Impacts of the Maglev System
This paper will examine the planning process required to conduct a transportation analysis for a high speed ground transportation system, utilizing the Orlando experience as an example....
Effect of Future High Speed Ground Transportation on Airport Expansion Needs in the State of Washington
A high speed ground transportation system is proposed to be built in the State of Washington to connect all regions. The proposed system will be approximately 700 miles in length and would...
Potential Statewide Impacts of Florida's Proposed High Speed Rail System
This paper presents a summary of the findings from an analysis of the potential statewide impacts resulting from the construction and operation of a high speed intercity rail system in...
Texas High Speed Rail Ridership Forecasting
On May 28, 1991, the Texas High Speed Rail Authority made a decision to implement a High Speed Rail (HSR) system in the `Texas Triangle,' which would connect five of Texas' largest cities...
Intercity Travel Demand Forecasting for the Windsor-Quebec City Corridor
Travel demand forecasts were required for the 600-mile-long Quebec City - Windsor Canada Corridor to test alternative rail systems including high speed rail. The approach involved application...
Assumptions Behind Ridership Forecasts for High Speed Ground Transportation Systems and Their Validity: The California-Nevada Case Study
Accurate prediction of ridership is one of the key elements for approval of any transit project and eventually for survival after the system begins operation. This is particularly true...
High-Speed Surface Transportation Cost Estimating
The cost of building and operating high-speed surface transportation (HSST) systems in the United States is a critical factor in determining their feasibility. Costs are difficult to estimate...
Selection and Analysis of Florida's High-Speed/Intercity Rail Routes
Events during 1990 and 1991 in Florida's High-Speed Rail Franchise process have driven the project toward the status of a public works project. With greater public participation than originally...
Return to search