The Design and Operating Experience of a Multiplexer Application in Conventional Hydro Powerhouse Control
The design of the Bonneville Second Powerhouse control system presented an opportunity to replace conventional cables with a multiplexer system that would provide a two-way data communication...

Capabilities of Automated Control System Employing Advanced Programmable Controllers
This paper details Voith Hydro's range of experience in the use of Programmable Logic Controllers (P. L. C. 's) in the automation of new hydro electric sites....

Integrated Automatic Hydroelectric Plant Control
The increased acceptance and employment of microcomputers to control specific functions in small hydroelectric plants has led to computerized integrated total control of hydropower generation....

Control and Tests of Tims Ford Induction Generator
This paper will discuss the electrical control scheme and commissioning tests developed for a small induction generator installed by the Tennessee Valley Authority (TVA) at its Tims Ford...

Hydropower Goes Downtown
Beneath a busy street in Southern California seems an unlikely location for a small hydroelectric generating plant. However, located just below El Segundo Boulevard in the town of El Segundo...

Design of Seepage Control Systems for RCC Dams
As the reservoirs of the first generation of roller compacted concrete (RCC) dams have been filled, several have exhibited significant amounts of seepage, a fact that has been of concern...

Quality Control/Inspection�Upper Stillwater Dam
Roller compacted concrete construction, or RCC, is a relatively new method of constructing concrete dams and involves placing and spreading no-slump concrete in horizontal layers and compacting...

Quality of Works in RCC in France: A Contractor's Solution
Bec Freres S. A. , a French dam contractor, introduced the technique of roller compacted concrete (RCC) into France. The first two French RCC dams were built as a result of a program of...

RCC in Dams in Australia
The design, construction and performance of the first three dams constructed in Australia, using RCC are described. Aspects covered in the paper include designing for zero cohesion between...

RCC Pavement Construction and Quality Control
In October 1986 a 16,500 sq yd (14,300 sq m) roller-compacted concrete (RCC) pavement tank hardstand, the first of its kind in Europe, was built for the U. S. Army at Harvey Barracks in...

Exploring Karst Terrain with Air Track Drilling
Pneumatic-powered track-mounted, percussion drills can be used to perform or augment geotechnical investigations in some karst settings. The air track drill is best suited to exploring...

Highway Factors in Truck Wrecks
An examination is presented of highway factors as they interact with driver and vehicle factors in large truck accident causation. Examples of highway defects are discussed along with...

Effects of Driver Factors and Training on Wrecks
A training program for professional drivers is reviewed. The effects of driver factors, as well as their training, on accidents is presented....

Truck Operating Characteristics in Relation to Safety
For a two-year period large truck crashes on the interstate system in Washington State were investigated using a case-control method. For each large truck involved in a crash, three trucks...

Design Considerations for Trucks in Work Zones
In an Eastern state a 3. 8 mi (6. 2 km) work zone had 14 accidents during a project duration of 120 days. Eleven of the 14 accidents occurred at temporary crossovers where traffic was...

Accommodation of Large Trucks: Traffic Control Issues
The objective of this paper is to identify ways that large trucks can be accommodated safely and efficiently through traffic control. Traffic control is herein defined as encompassing...

Accommodating Larger Trucks at At-Grade Intersections
When a particular intersection serves a high volume of large truck traffic, design considerations should reflect the presence of those larger vehicles. This paper discusses three intersection...

Evaluation of Air Quality Methods in the Asbestos Work Area
Air monitoring is a technique that is routinely used to measure the level of asbestos in a given airspace. This technique has changed significantly since its first use in the asbestos...

Professional Liability on Asbestos Abatement Projects
When the engineer is retained on an asbestos abatement project, he or she must bring to the job and employ that degree of skill and learning ordinarily exercised in the profession in similar...

Probabilistic Design of Flexible Pavements
Numerous random phenomena enter into the process of deterioration of pavements under the effect of traffic. It is felt that improvement in current design methods could be obtained by adopting...

 

 

 

 

Return to search