Ambient Suspended Sediment Concentration and Turbidity Levels
The temporal variation of suspended sediment concentration and turbidity is an important component of the riverine environment. The maximum rate of discrete volumetric sample collection...
Two-Dimensional Hydrodynamic Modeling of a Reach of the Mississippi River in Pool 19
A depth-integrated finite-element model (RMA-2V) was applied on a section of the Upper Mississippi River to study the hydraulic characteristics of the floodplain-river system. The area...
On The Application of Artificial Viscosity in Computational Hydraulics
Artificial viscosity is a particular kind of truncation error that is either implicity present or explicitly added to the finite difference schemes. It is shown that the method of lines...
Coastal Watershed Unit Hydrographs and Methods
The results of a study to determine unit hydrograph peak rate factors for South Carolina coastal watersheds are summarized and compared with traditional values. An extension to the SCS...
Temporary Facilities?Making It Happen, Organization and Logistics
As construction projects become larger, more complex and are constructed both faster and under more adverse conditions--the use of temporary facilities is more prevalent. Temporary facilities...
CPM Techniques for Claims Avoidance and Preparation
Virtually all major construction claims consist of some aspects of delay, disruption or acceleration. Since all of the foregoing relate directly to the timing and sequencing of the project...
Design and Planning of Structural Steel Roll-In
Innovative construction methods were required to erect structural steel inside a 170 foot long box truss over a railroad. The contractor engineered and executed a unique system to roll...
Who Pays for the Unexpected in Construction: The Geotechnical Contractor's Point of View
Unexpected conditions are inherent in most construction projects and often lead to claims and legal action. Contract risk avoidance language force owners, engineers and contractors to...
Laboratory and Field Research in Construction Automation
This paper presents a series of research projects to build and test prototype systems. It has been found that prototyping provides an economical approach to support both basic and applied...
Animation of Automated Space Construction
This paper presents a discussion of Three-Dimensional Computer Animation as applied to the evaluation of Lunar/Mars construction. A number of applications for this type of tool are introduced....
Computer Assisted Design and Construction
This paper presents a comprehensive package for conducting structural analysis, design, and project management on microcomputers. Several examples are presented to illustrate the usefulness...
Graphical Database for Construction Planning and Cost Control
Stone & Webster Engineering Corporation is using Computer Aided Construction (CAC) System that integrated construction planning with estimate development, schedule generation,...
An Object Oriented Design Methodology for Systems Integration ? A Research-in-Progress Report
This paper reports the progress of a research project to develop an object oriented design methodology for systems integration. The paper discusses motivation for this research, research...
Construction Process Knowledge Model to Assist Method Selection?Research in Progress
The project planning stage is a very critical stage in the construction project development and delivery phase of the lifecycle of a building project. This stage creates the framework...
Integrated Design and Construction Planning by Knowledge-based Systems
The main objective of this paper is to describe applications of knowledge-based systems for the improvement of planning and management efficiency at the early design stage, and to propose...
Factors Affecting the Transfer of Expert Systems Technology
Increased complexity of facilities, owners' changing needs, inadequate construction methods, and international competition have created strong demands for advanced construction...
Learning and Innovating in a Construction Technology Laboratory
It has been generally recognized that the construction industry world wide, and especially in the U.S., needs innovative changes in order to produce more complex products at higher quality...
Case Method to Educate Innovation Champions in Construction
This paper describes a recent experimental course concerning management of technology for construction innovation. The experience of conducting this course indicates that the case method...
Geotechnical and Construction Aspects of the Immersed Tube Tunnel in Boston Harbor
An immersed tube tunnel (ITT) approximately 3,850 feet in length will be constructed as a part of the Central Artery/Tunnel Interstate Highway Project located in Boston, Massachusetts....
Immersed Tube Tunnel, Boston, Massachusetts
A four-lane Immersed Tube Tunnel is planned for the crossing of Boston Harbor from the City of Boston to the Logan Airport area in East Boston. The immersed tube consists of 12 sections...
Return to search