Save the Walls
A rehabilitation job in name only, the 75 year old Army and Navy Club, a landmark located in Washington D.C.'s Golden Triangle, retained only two of its 80 ft high exterior...

Concrete Strength Record Jumps 36%
A Seattle building now going up has 19,000 psi concrete, the strongest ever in conventional structures. It costs three times as much as conventional concrete, so will not be widely used....

A Strategic Approach to Planning and Financing Public Facilities
This paper presents a comprehensive, strategic approach to planning and financing public facilities by a toll road authority. Because the Authority finances projects through the sale of...

The Effects of Earthquakes on Power and Industrial Facilities and Implications for Nuclear Power Plant Design
Fifteen earthquakes, ranging from magnitude 5.2 to 8.4 on the Richter scale that have occurred in five countries since 1952, were studied. This report documents the performance of power...

Wind Tunnel Model Studies of Buildings and Structures
This manual provides guidelines on wind tunnel model testing of buildings and structures. Included are procedures required to provide representative information on wind effects experienced...

Expert Systems for Civil Engineers
Technology and Application
This book identifies expert systems technology and describes some applications to civil engineering problems. The first part of the book is on expert system technology. Expert system components...

Engineering a Corporate Statement
Frito-Lay National Headquarters, Plano, Tex., occupies a 218 acre site in a corporate office park that had been a cow pasture. It was unusual in having mature trees and a natural watercourse...

Bright Lights Over China
The financing for Guangdong province's newest 700 mw coal fired electric power station came from a syndicate of 46 banks from 11 countries. The steel for the turbine generators...

Surveying for Scour
The public works engineer never knows exactly how many bridge piers and abutments are undermined by erosion due to scour. Massachusetts Department of Public Works needed a rapid method...

Digestor Do-Over
Digesters at 6 Orange County (Calif.) wastewater treatment plants needed drastic odor control rehabilitation. Repairs included epoxy patching to cracked domes, installation of a geomembrane...

Escondido Decision?Results, Impacts & Applications
The United States Ninth Circuit Court of Appeals decision of May 15, 1984, now requires Federal agencies and potential licensees to be more responsive to public needs and requirements....

The Contribution of Local Area Management Teams Under Severe Environmental Conditions
This paper outlines a Westinghouse managed turnkey hydro electric project located in remote southwestern Wyoming near Kemmerer. The dam provides watershed control for the Hams Fork River,...

Checking Turbine Performance by Index Testing
This paper discusses an index testing procedure used by TVA for measuring performance levels of its hydroelectric units. It also describes a current program for retesting generating units...

Index Testing?Relative Turbine Performance
The Index method of testing hydraulic turbines consists of making a test in which the value of power output and head are measured and in which the quantities of water and velocity head...

Sherman Island Hydro Cofferdam
The design and construction of an eight hundred foot long by sixty-five foot high cofferdam is discussed. The cofferdam was located to permit major renovation of the existing downstream...

Nanpil River Hydropower Project Pohnpei, Federated States of Micronesia
The Nanpil River Hydropower Project is a 1600 KW run-of-the-river hydropower project located on the tropical island of Pohnpei, Federated States of Micronesia. The hydropower project will...

The Lowell Hydroelectric Project: A Case Study
The Lowell Hydroelectric Project, located on the Merrimack River in Lowell, Massachusetts, consists of an existing dam, canals, and turbine generating equipment presently operating at...

Design of Tension Member Insulated Anchor for Arctic Pipelines
This paper explores the latest development in above-ground waterflood pipe anchors currently being used on the SOHIO operated portion of the Prudhoe Bay Oil Field. The objective of the...

Design Evaluations in Support of Offshore Facilities and Gravel Islands in the Arctic
Development of oil resources in Northern Alaska has involved the design of nearshore and offshore facilities and structures in the Beaufort Sea and Prudhoe Bay in water depths ranging...

Lessons Learned From Examination of Membrane Roofs in Alaska
During 1984 and 1985 airborne infrared roof moisture surveys were conducted of membrane roofs at Army installations in Alaska. Many of these roofs were also visually inspected and cored...

 

 

 

 

Return to search