Evaluation of In-Situ Bio-Denitrification for Nitrate Reduction in Groundwater
This paper examines the potential application of in-situ bio-dentrification as well as pertinent physical and biochemical factors that control the process to reduce nitrate in groundwater...

In Situ Remediation of Hazardous Wastes
Numerous releases of hazardous substances have occurred at uncontrolled sites all around the United States. These sites pose toxic threats to public health and our environment, and potential...

CADD for Export
By using sophisticated structural design software and high-speed PCs, engineers in Pittsburgh overcame myriad problems when designing a highrise industrial tower in India. First, they...

Effects of Hydroelectric Turbine Passage on Fish Early Life Stages
Turbine-passage mortality has been studied extensively for juveniles and adults of migratory fish species, but few studies have directly quantified mortality of fish eggs and larvae. An...

Fish Protection at Water Intakes Using a New Signal Development Process and Sound System
American Electric Power Company, Inc., is exploring the feasibility of using a patented signal development process and sound system to guide aquatic animals with underwater sound. Sounds...

Hydraulic Model Studies for Non-Federal Projects at Federal Dams?A Case Study
This paper will discuss the hydraulic model studies for hydropower projects developed by Arkansas Electric Cooperative Corporation (a non-federal entity) at existing Corps of Engineers...

Varying Generator Excitation to Control Draft Tube Surge
The Bureau of Reclamation recently experimented with varying the excitation applied to a hydroelectric generator to control power swings caused by draft tube surging in a Francis turbine....

Dam Safety Hydrologic and Seismic Evaluation of TVA'S Beech Dam
Beech Dam is part of the Beech River watershed resource development located in Decatur and Henderson counties in west Tennessee. The development consists of eight dams and approximately...

B.C. Hydro's Practice for Assessing the Foundations of Existing Dams on Rock
Since the early 1980's B.C. Hydro has carried out dam safety reviews which included 33 gravity and embankment dams founded on rock. The foundations include moderately jointed,...

Foundation Investigations of Concrete Dams
This paper discusses a series of foundation investigations conducted on concrete dams by Pacific Gas and Electric Company. The paper focuses on investigative techniques, equipment, appropriate...

Rocky Mountain Project Power Tunnel Filling Test
The Rocky Mountain Project, a pumped storage development located in NW Georgia, is owned jointly by Oglethorpe Power Corporation and Georgia Power Company. Initial construction included...

Seismic Analysis of the Bonneville 1st Powerhouse
The Bonneville 1st powerhouse monoliths were constructed during the period of 1938 to 1942 and were designed against seismic loads using the old lateral coefficient method. The Corps of...

Concrete Gravity Dam Cracking Analysis Methodology
This paper describes a methodology for the prediction and evaluation of cracking behavior in concrete gravity dam's for use in periodic safety investigations as outlined in...

Cone Penetration Testing: Cost Effective Soil Exploration
On reviewing the 1987 Part 12 Dam Safety Inspection Reports for the Wisconsin River Power Company's Petenwell and Castle Rock Dams, the Federal Energy Regulatory Commission...

Field Tests of a Lewiston Pump-Generating Unit
An extensive field test program was undertaken on a Lewiston Pump-Generating Plant (LPGP) unit at the Niagara Power Project, owned and operated by the New York Power Authority. The objective...

Evaluation of Turbine Intake Velocity Criteria
The paper addresses the effect of intake flow distribution on turbine performance at low-head projects. Field and model test data are used to raise the question of whether typical turbine...

Laboratory and Field Experience with Cavitation Monitoring of Hydroturbines
When control of cavitation erosion can be accomplished by changes in operating conditions, real-time monitoring of cavitation level is a valuable tool. Three types of cavitation monitors...

Waterpower 91?Laboratory Investigation of Syphon Intakes
The Federal Department of Energy, Mines and Resources (Canada) has funded four separate investigations of syphon hydro technology. These study phases, which were carried out by Acres Hydraulic...

Diagnostic Testing and Repair of Grand Rapids Generating Station's Unit Four
This paper is a case history that discusses diagnosis and correction of a variable pitch propeller type (Kaplan) hydraulic turbine problem. The turbine problem involved fatigue failures...

Case Study in the Upgrade and Rehabilitation Techniques of a Pumped Storage Installation
This paper presents a specific case study in the runner upgrade and unit rehabilitation of two pump/turbines at the Seneca Powerhouse. The study addresses the modern optimized designs...

 

 

 

 